Abidjan Metro
Planned rapid transit system in Abidjan, Ivory Coast
The Abidjan Metro (French: Métro d'Abidjan) is a 37.5-kilometre (23.3 mi) rapid transit network under construction serving the Ivorian economic capital of Abidjan. Construction of the network started in November 2017, with the beginning of passenger service originally expected in 2022–2023, but has since been delayed due to the COVID-19 pandemic to at least 2028.
Nº Q16680881 ★★★
Rare · History
Abidjan Metro
Planned rapid transit system in Abidjan, Ivory Coast
The Abidjan Metro (French: Métro d'Abidjan) is a 37.5-kilometre (23.3 mi) rapid transit network under construction serving the Ivorian economic capital of Abidjan. Construction of the network started in November 2017, with the beginning of passenger service originally expected in 2022–2023, but has since been delayed due to the COVID-19 pandemic to at least 2028.
Last price
—
Floor price
—
7-day median
—
30-day sales
0
30-day range
—
In circulation
0
Price history
median
low – high
sales
No sales in this period
Show table
| Date | median | Low | High | sales |
|---|
Sales history
- Last sale
- —
- 30-day average
- —
- 30-day low
- —
- 30-day high
- —
- Sales 7d
- 0
- Sales 30d
- 0
No sales yet.
Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.
From Wikipedia
The Abidjan Metro (French: Métro d'Abidjan) is a 37.5-kilometre (23.3 mi) rapid transit network under construction serving the Ivorian economic capital of Abidjan. Construction of the network started in November 2017, with the beginning of passenger service originally expected in 2022–2023, but has since been delayed due to the COVID-19 pandemic to at least 2028. Initially planned to comprise a single line with 13 stations undertaken by Bouygues-Dongsan, a French-Korean consortium, the project has since then been expanded to a single north–south line with 20 stations with 18 stations in service at opening and 2 more in the future, financed 100% by France and built solely by three French groups (Bouygues, through its subsidiaries Bouygues Travaux Publics and Colas Rail, Alstom, and Keolis) after the withdrawal of the South Korean partners from the consortium in October 2017. Built mostly as an overground and elevated railway in order to avoid more costly tunnels, its automated trains with a driver present in the cabin will be able to run at a top speed of 80 km/h (50 miles/hour) and a maximum frequency of about every 2 minutes. Line 1 of the Abidjan metro is expected to transport 500,000 passengers per day (180 million per year). Construction of line 1 will cost 920 billion CFA francs (1.4 billion euros; 1.7 billion US dollars), entirely financed by France via the French Treasury and the French Development Agency. In 2018 the Ivorian government was planning for a second line of the Abidjan Metro, an east–west line which would run from Yopougon to Bingerville. In February 2025, the Minister of Transport Amadou Koné held an information meeting, claiming the construction is continuing steadily. Of the 4,431 buildings to be demolished for land clearing, 4,417 have been demolished. As of February 19, 2025, studies on the project...
Text: Wikipédia, CC BY-SA 4.0. · Image: Skiper (CC BY-SA 3.0) ·
Related cards
Abidjan Transport Company
Nº Q2792164 ★★
Réseau express métropolitain
Rapid transit system in the Greater Montreal area
Nº Q19582331 ★★★
Cairo Metro Line 1
Metro system in Cairo, Egypt
Nº Q5017774 ★★
Tel Aviv Metro
Planned subway system for the Tel Aviv Metro Area
Nº Q28220630 ★★
Xuzhou Metro
Rapid transit system in Xuzhou, China
Nº Q11070585 ★★★
Indore Metro
Rapid transit system in Indore, India
Nº Q17056449 ★