Almatti Dam

Dam in India

The Lal Bahadur Shastri Dam is also known as Almatti Dam is a hydroelectric project on the Krishna River in North Karnataka, India which was completed in July 2005. The target annual electric output of the dam is 560 MU (or GWh).

Nº Q3444765 ★★

Uncommon · Architecture

Almatti Dam

Dam in India

The Lal Bahadur Shastri Dam is also known as Almatti Dam is a hydroelectric project on the Krishna River in North Karnataka, India which was completed in July 2005. The target annual electric output of the dam is 560 MU (or GWh).

On the map

View on OpenStreetMap · © OpenStreetMap contributors

Last price

—

Floor price

—

7-day median

—

30-day sales

0

30-day range

—

In circulation

0

Price history

Show table
Datemedian LowHighsales

Sales history

Last sale
—
30-day average
—
30-day low
—
30-day high
—
Sales 7d
0
Sales 30d
0

No sales yet.

Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.

From Wikipedia

The Lal Bahadur Shastri Dam is also known as Almatti Dam is a hydroelectric project on the Krishna River in North Karnataka, India which was completed in July 2005. The target annual electric output of the dam is 560 MU (or GWh). The Almatti Dam is the main reservoir of the Upper Krishna Irrigation Project; the 290 MW power station is located on the right side of the Almatti Dam. The facility uses vertical Kaplan turbines: five 55MW generators and one 15MW generator. Water is released in to the Narayanpur reservoir after using for power generation to serve the downstream irrigation needs. Two separate facilities namely, Almatti 1 Powerhouse and Almatti II Powerhouse each separated by distance do provide power generation capabilities. During the initial stages of the project, estimated costs were projected as ₹ 1,470 crores, but following the transfer of project's management to the Karnataka Power Corporation Limited (KPCL), the estimated cost was reduced by over fifty percent to ₹ 674 crores. KPCL eventually completed the project at an even lower cost of ₹ 520 crores. The entire dam was finished in less than forty months, with construction ending in July 2005. The dam is located on the edge of Vijayapura and Bagalkote districts. Geographically, it is located in the Vijayapura district, but large areas of Bagalkote district have also been submerged due to filling of the reservoir. The dam holds a gross water storage capacity of 123.08 TMC at 519 meters MSL. The backwaters of the dam host several migratory birds during summer.

Text: Wikipédia, CC BY-SA 4.0. · Image: Murughendra (CC BY-SA 3.0) ·

Related cards

View card

Confirmation