Buenos Aires Underground
Rapid transit railway in Buenos Aires, Argentina
Nº Q497044 ★★★★
Super Rare · Places
Buenos Aires Underground
Rapid transit railway in Buenos Aires, Argentina
The Buenos Aires Underground (Spanish: Subterráneo de Buenos Aires), locally known as Subte (Spanish: [ˈsuβte]), is a rapid transit system that serves the area of the city of Buenos Aires, Argentina. The first section of this network (Plaza de Mayo–Plaza Miserere) opened in 1913, making it the 13th earliest subway network in the world and the first underground railway in Latin America, the Southern Hemisphere, and the Spanish-speaking world, with the Madrid Metro opening nearly six years later, in 1919.
Last price
—
Floor price
—
7-day median
—
30-day sales
0
30-day range
—
In circulation
0
Price history
median
low – high
sales
No sales in this period
Show table
| Date | median | Low | High | sales |
|---|
Sales history
- Last sale
- —
- 30-day average
- —
- 30-day low
- —
- 30-day high
- —
- Sales 7d
- 0
- Sales 30d
- 0
No sales yet.
Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.
From Wikipedia
The Buenos Aires Underground (Spanish: Subterráneo de Buenos Aires), locally known as Subte (Spanish: [ˈsuβte]), is a rapid transit system that serves the area of the city of Buenos Aires, Argentina. The first section of this network (Plaza de Mayo–Plaza Miserere) opened in 1913, making it the 13th earliest subway network in the world and the first underground railway in Latin America, the Southern Hemisphere, and the Spanish-speaking world, with the Madrid Metro opening nearly six years later, in 1919. As of 2026, Buenos Aires is the only Argentine city with a metro system. Currently, the underground network's six lines—A, B, C, D, E, and H—comprise 56.7 kilometers (35.2 mi) of routes that serve 90 stations. The network is complemented by the 7.4-kilometre-long (4.6 mi) Line P, an 18 station premetro line. Traffic on subterranean lines moves on the left because Argentina drove on the left at the time the system opened. Over a million passengers use the network, which also provides connections with the city's extensive commuter rail and bus rapid transport networks. The network expanded rapidly during the early decades of the 20th century; by 1944, its main routes were completed, with the addition of its newest line occurring as late as 2007. The pace of expansion fell sharply after the Second World War. In the late 1990s, expansion resumed at a quicker pace, and four new lines were planned for the network. Despite this, the network's expansion has been largely exceeded by the transportation needs of the city and is said to be overcrowded. In 2015, two modernization plans were presented: City of Buenos Aires Law 670, proposing the creation of 3 new lines (F, G, and I), and the PETERS plan, wherein 2 lines were to be created and the I line would have been postponed...
Text: Wikipédia, CC BY-SA 4.0. · Image: GCBA (CC BY 2.5 ar) ·