Edmonton LRT

Light rail transit system in Edmonton, Alberta, Canada

Nº Q1285861 ★★

Uncommon · Places

Edmonton LRT

Light rail transit system in Edmonton, Alberta, Canada

Edmonton Light Rail Transit, commonly referred to as the LRT, is a light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the system has 29 stops and stations on three lines and 37.4 km (23.2 mi) of track.

Last price

—

Floor price

—

7-day median

—

30-day sales

0

30-day range

—

In circulation

0

Price history

Show table
Datemedian LowHighsales

Sales history

Last sale
—
30-day average
—
30-day low
—
30-day high
—
Sales 7d
0
Sales 30d
0

No sales yet.

Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.

From Wikipedia

Edmonton Light Rail Transit, commonly referred to as the LRT, is a light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the system has 29 stops and stations on three lines and 37.4 km (23.2 mi) of track. Much of the system has a dedicated right-of-way, while in the downtown area, the light rail vehicles (LRVs) run underground. As of 2018, it was the seventh busiest light rail transit system in North America, with over 113,000 daily weekday riders. The ETS started operation of the original LRT line in 1978, expanded by 2010 into the Capital Line, running between Clareview in Edmonton's northeast and Century Park in Edmonton's south end. The first phase of the newer Metro Line started service between the University of Alberta campus and hospital in Edmonton's south-central and the Northern Alberta Institute of Technology northwest of downtown Edmonton in 2015, with further expansion to north Edmonton and neighbouring city of St. Albert planned into the future. Construction of the first phase of the 27-kilometre (17 mi) Valley Line, from downtown Edmonton to Mill Woods in southeast Edmonton, began in spring 2016, and opened for passenger service November 4, 2023. The line is operated under contract by TransEd Partners on behalf of Edmonton Transit Service. Construction on the second phase of the Valley Line, connecting downtown to west Edmonton, began in fall 2021 and is scheduled for completion by 2028. Following completion of the west extension, operational control will transfer fully to Edmonton Transit Service.

Text: Wikipédia, CC BY-SA 4.0. · Image: Jakub Limanowka (Public domain) ·

Related cards

Confirmation