Full load hour
Measure of the degree of utilisation
Full Load hour is a measure of the degree of utilisation of a technical system. Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur.
Nº Q1638137 ★★
Uncommon · Knowledge
Full load hour
Measure of the degree of utilisation
Full Load hour is a measure of the degree of utilisation of a technical system. Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur.
Last price
—
Floor price
—
7-day median
—
30-day sales
0
30-day range
—
In circulation
0
Price history
median
low – high
sales
No sales in this period
Show table
| Date | median | Low | High | sales |
|---|
Sales history
- Last sale
- —
- 30-day average
- —
- 30-day low
- —
- 30-day high
- —
- Sales 7d
- 0
- Sales 30d
- 0
No sales yet.
Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.
From Wikipedia
Full Load hour is a measure of the degree of utilisation of a technical system. Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur. The figure usually refers to a period of one calendar year and is mainly applied to power plants. The annual utilisation rate or capacity factor derived from the number of full-load hours is the relative full-load utilisation in a year, i.e. the number of full-load hours divided by 8760 hours, the number of hours in a year with 365 days.
Text: Wikipédia, CC BY-SA 4.0. ·
Related cards
-
L
Load factor (electrical)
The average power divided by the peak power over a period of time
Nº Q17099407 ★
Not listed
-
L
Level (logarithmic quantity)
Logarithm of the ratio of two quantities
Nº Q11349892 ★
Not listed
-
Capacity factor
Unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over the same amount of time
Nº Q1755148 ★★
Not listed
-
Degree day
Measure of heating or cooling used in agriculture
Nº Q1514559 ★★★★
Not listed
-
Local mean time
Form of solar time that corrects the variations of local apparent time, forming a uniform time scale at a specific longitude
Nº Q219919 ★
Not listed
-
Electrical measurements
Methods, devices and calculations used to measure electrical quantities
Nº Q3859407 ★★
Not listed