Ituango Dam
Dam in Ituango
Nº Q1675339 ★★★
Rare · Places
Ituango Dam
Dam in Ituango
The Ituango Dam, also referred to as the Pescadero-Ituango Dam or Hidroituango, is an embankment dam under construction on the Cauca River near Ituango in Antioquia Department, Colombia. The primary purpose of the project is hydroelectric power generation, and its power plant will have an installed capacity of 2,456 megawatts (3,294,000 hp) if completed.
Last price
—
Floor price
—
7-day median
—
30-day sales
0
30-day range
—
In circulation
0
Price history
median
low – high
sales
No sales in this period
Show table
| Date | median | Low | High | sales |
|---|
Sales history
- Last sale
- —
- 30-day average
- —
- 30-day low
- —
- 30-day high
- —
- Sales 7d
- 0
- Sales 30d
- 0
No sales yet.
Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.
From Wikipedia
The Ituango Dam, also referred to as the Pescadero-Ituango Dam or Hidroituango, is an embankment dam under construction on the Cauca River near Ituango in Antioquia Department, Colombia. The primary purpose of the project is hydroelectric power generation, and its power plant will have an installed capacity of 2,456 megawatts (3,294,000 hp) if completed. Preliminary construction on the dam began in September 2011, and the plant was expected to begin operations in late 2018. Heavy rainfall and landslides in April–May 2018 blocked the river's diversion tunnel, threatening a breach of the dam. If completed, Ituango will be the largest power station in Colombia.
Text: Wikipédia, CC BY-SA 4.0. · Image: Fotografía oficial de la Presidencia de Colombia (CC0) ·