Kontek

HVDC interconnector between Germany and Denmark

The Kontek HVDC is a 170-kilometre (110 mi) long, monopolar 400 kV high-voltage direct current cable between Germany and the Danish island Zealand. Its name comes from "continent" and the name of the former Danish power transmission company "Elkraft", which operated the power grid on the Danish islands Lolland, Falster and Zealand and had the abbreviation "ek".

Nº Q175924 ★

Common · Architecture

Kontek

HVDC interconnector between Germany and Denmark

The Kontek HVDC is a 170-kilometre (110 mi) long, monopolar 400 kV high-voltage direct current cable between Germany and the Danish island Zealand. Its name comes from "continent" and the name of the former Danish power transmission company "Elkraft", which operated the power grid on the Danish islands Lolland, Falster and Zealand and had the abbreviation "ek".

Last price

—

Floor price

—

7-day median

—

30-day sales

0

30-day range

—

In circulation

0

Price history

Show table
Datemedian LowHighsales

Sales history

Last sale
—
30-day average
—
30-day low
—
30-day high
—
Sales 7d
0
Sales 30d
0

No sales yet.

Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.

From Wikipedia

The Kontek HVDC is a 170-kilometre (110 mi) long, monopolar 400 kV high-voltage direct current cable between Germany and the Danish island Zealand. Its name comes from "continent" and the name of the former Danish power transmission company "Elkraft", which operated the power grid on the Danish islands Lolland, Falster and Zealand and had the abbreviation "ek". As of today, the cable is operated by Energinet.dk in Denmark and 50Hertz Transmission GmbH in Germany. Kontek is remarkable because, in contrast to similar facilities like Baltic Cable and Konti-Skan, all land sections of the 119-kilometre (74 mi) onshore lines on Falster, Zealand and Germany are implemented as underground cable. This unusual measure, which raised the construction costs of Kontek significantly, was made for practical rather than technical reasons. Obtaining permission for building overhead lines can take a long time, and hence underground cables were used in order to ensure it was completed on schedule.

Text: Wikipédia, CC BY-SA 4.0. · Image: Timberwind (CC BY-SA 3.0) ·

Related cards

View card

Confirmation