Main Ground Combat System
European battle tank project
The Main Ground Combat System (MGCS) is a project launched in 2017 by Germany and France, originally aiming to replace their current Leopard 2 and Leclerc main battle tanks. Coordinated by Germany, in contrast to the other major Franco-German program launched in 2018 (the Future Combat Air System implemented under French lead), the MGCS will not be a single armoured fighting vehicle, but a series of systems conceived around said vehicle.
Nº Q60754406 ★★★
Rare · Knowledge
Main Ground Combat System
European battle tank project
The Main Ground Combat System (MGCS) is a project launched in 2017 by Germany and France, originally aiming to replace their current Leopard 2 and Leclerc main battle tanks. Coordinated by Germany, in contrast to the other major Franco-German program launched in 2018 (the Future Combat Air System implemented under French lead), the MGCS will not be a single armoured fighting vehicle, but a series of systems conceived around said vehicle.
Last price
—
Floor price
—
7-day median
—
30-day sales
0
30-day range
—
In circulation
0
Price history
median
low – high
sales
No sales in this period
Show table
| Date | median | Low | High | sales |
|---|
Sales history
- Last sale
- —
- 30-day average
- —
- 30-day low
- —
- 30-day high
- —
- Sales 7d
- 0
- Sales 30d
- 0
No sales yet.
Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.
From Wikipedia
The Main Ground Combat System (MGCS) is a project launched in 2017 by Germany and France, originally aiming to replace their current Leopard 2 and Leclerc main battle tanks. Coordinated by Germany, in contrast to the other major Franco-German program launched in 2018 (the Future Combat Air System implemented under French lead), the MGCS will not be a single armoured fighting vehicle, but a series of systems conceived around said vehicle. It was to be developed and manufactured by KNDS (a holding company founded in 2015 by German arms producer KMW and the French defence firm Nexter Systems) and Rheinmetall, which joined the project in 2019. Rheinmetall's addition to the MGCS did not go without tensions between Paris and Berlin, as development leadership of the various pillars of the program as well industrial production were supposed to be equally split between the two countries. Ultimately, an agreement was reached, with Nexter, KMW and Rheinmetall leading the development of 1/3 of the program's pillars each, with a guarantee that Nexter will manufacture 50% of the systems as originally agreed, while the remaining half is shared between the two German contractors. Full operational capability (FOC) of the ground combat system is expected by 2040. According to Frank Haun, CEO of KNDS, various countries have shown interest in joining the MGCS, including Italy, Norway, Poland, Spain, Sweden and the United Kingdom. Discussions are still ongoing on the matter as of 2022.
Text: Wikipédia, CC BY-SA 4.0. ·
Related cards
Main battle tank
Tank designed to conduct primary combat missions on the battlefield
Nº Q920182 ★★★
EMBT
French-German tank
Nº Q5816149 ★
VT-4
Main battle tank under development for the People's Liberation Army of China
Nº Q6577008 ★★★
Leopard 2
German main battle tank
Nº Q151968 ★★★★★
Leopard 2PL
Type of main battle tank
Nº Q97100296 ★★
Leopard 2E
German main battle tank
Nº Q3119059 ★★★