Second Avenue Subway
New York City Subway line
The Second Avenue Subway (internally referred to as the IND Second Avenue Line by the MTA and abbreviated to SAS) is a New York City Subway line which runs under Second Avenue on the East Side of Manhattan. The first phase of this new line, with three new stations on Manhattan's Upper East Side, opened on January 1, 2017.
Nº Q2104718 ★★★
Rare · History
Second Avenue Subway
New York City Subway line
The Second Avenue Subway (internally referred to as the IND Second Avenue Line by the MTA and abbreviated to SAS) is a New York City Subway line which runs under Second Avenue on the East Side of Manhattan. The first phase of this new line, with three new stations on Manhattan's Upper East Side, opened on January 1, 2017.
Last price
—
Floor price
—
7-day median
—
30-day sales
0
30-day range
—
In circulation
0
Price history
median
low – high
sales
No sales in this period
Show table
| Date | median | Low | High | sales |
|---|
Sales history
- Last sale
- —
- 30-day average
- —
- 30-day low
- —
- 30-day high
- —
- Sales 7d
- 0
- Sales 30d
- 0
No sales yet.
Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.
From Wikipedia
The Second Avenue Subway (internally referred to as the IND Second Avenue Line by the MTA and abbreviated to SAS) is a New York City Subway line which runs under Second Avenue on the East Side of Manhattan. The first phase of this new line, with three new stations on Manhattan's Upper East Side, opened on January 1, 2017. The full Second Avenue Line (if funded) will be built in three more phases to eventually connect Harlem–125th Street in East Harlem to Hanover Square in Lower Manhattan. The proposed full line would be 10 miles (16 km) and 19 stations long, serve a projected 724,000 daily riders, and cost more than $24.7 billion. The line was originally proposed in 1920 as part of a massive expansion of what would become the Independent Subway System (IND). In anticipation of the Second Avenue Subway being built to replace them, parallel elevated lines along Second Avenue and Third Avenue were demolished in 1942 and 1955, respectively, despite several factors causing plans for the Second Avenue Subway to be cancelled. Construction on the line began in 1972 as part of the Program for Action. It was halted in 1975 because of the city's fiscal crisis, leaving only a few short segments of tunnels completed. Work on the line restarted in April 2007 following the development of a financially secure construction plan. The first phase of the line, consisting of the 96th Street, 86th Street and 72nd Street stations, as well as 1.8 mi (2.9 km) of tunnel, cost $4.45 billion. A 1.5-mile (2.4 km), $6 billion second phase from 96th to 125th Streets began construction in June 2026. Phase 1 is served by the Q train at all times and limited rush-hour N and R trains. Phase 2 will extend the line's northern terminus...
Text: Wikipédia, CC BY-SA 4.0. · Image: Metropolitan Transportation Authority of the State of New Yo... (CC BY 2.0) ·
Related cards
T (New York City Subway service)
Prospective New York City Subway service
Nº Q16531269 ★★
IRT Lexington Avenue Line
New York City Subway line
Nº Q2620591 ★★
IND Eighth Avenue Line
NYC Subway trunk line under Eighth Avenue
Nº Q2373436 ★
Times Square–42nd Street station
New York City Subway station
Nº Q11265 ★★
East Side Access
Railroad public works project in New York City
Nº Q937694 ★
2 (New York City Subway service)
New York City Subway service
Nº Q126142 ★★