THTR-300

Thorium nuclear reactor in Germany

Nº Q566211 ★★★

Rare · Architecture

THTR-300

Thorium nuclear reactor in Germany

The THTR-300 was a thorium cycle high-temperature nuclear reactor rated at 300 MW electric (THTR-300) in Hamm-Uentrop, West Germany. It started operating in 1983, synchronized with the grid in 1985, operated at full power in February 1987 and was shut down on 1 September 1989.

Last price

—

Floor price

—

7-day median

—

30-day sales

0

30-day range

—

In circulation

0

Price history

Show table
Datemedian LowHighsales

Sales history

Last sale
—
30-day average
—
30-day low
—
30-day high
—
Sales 7d
0
Sales 30d
0

No sales yet.

Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.

№ Numbered editions · 0 minted Next #1 · Score ×3
From Wikipedia

The THTR-300 was a thorium cycle high-temperature nuclear reactor rated at 300 MW electric (THTR-300) in Hamm-Uentrop, West Germany. It started operating in 1983, synchronized with the grid in 1985, operated at full power in February 1987 and was shut down on 1 September 1989. The THTR-300 served as a prototype high-temperature reactor (HTR) to use the TRISO pebble fuel produced by the AVR, an experimental pebble bed operated by VEW (Vereinigte Elektrizitätswerke Westfalen). The THTR-300 cost €2.05 billion and was predicted to cost an additional €425 million through December 2009 in decommissioning and other associated costs. The German state of North Rhine Westphalia, Federal Republic of Germany, and Hochtemperatur-Kernkraftwerk GmbH (HKG) financed the THTR-300’s construction.

Text: Wikipédia, CC BY-SA 4.0. · Image: Tim Reckmann, cuts by ChNPP (CC BY-SA 3.0) ·

Related cards

Confirmation