Work breakdown structure

Deliverable oriented decomposition of a project into smaller components (in project management and systems engineering)

Nº Q918141 ★★

Uncommon · Knowledge

Work breakdown structure

Deliverable oriented decomposition of a project into smaller components (in project management and systems engineering)

A work-breakdown structure (WBS) in project management and systems engineering is a breakdown of a project into smaller components. It is a key project management element that organizes the team's work into manageable sections.

Last price

—

Floor price

—

7-day median

—

30-day sales

0

30-day range

—

In circulation

0

Price history

Show table
Datemedian LowHighsales

Sales history

Last sale
—
30-day average
—
30-day low
—
30-day high
—
Sales 7d
0
Sales 30d
0

No sales yet.

Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.

From Wikipedia

A work-breakdown structure (WBS) in project management and systems engineering is a breakdown of a project into smaller components. It is a key project management element that organizes the team's work into manageable sections. The Project Management Body of Knowledge defines the work-breakdown structure as a "hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables." A WBS provides the necessary framework for detailed cost estimation and control while providing guidance for schedule development and control.

Text: Wikipédia, CC BY-SA 4.0. · Image: US gov (Public domain) ·

Related cards

Confirmation