work scheduling
All preparatory measures for the economic production of products
Nº Q629329 ★★
Uncommon · History
work scheduling
All preparatory measures for the economic production of products
Last price
—
Floor price
—
7-day median
—
30-day sales
0
30-day range
—
In circulation
0
Price history
median
low – high
sales
No sales in this period
Show table
| Date | median | Low | High | sales |
|---|
Sales history
- Last sale
- —
- 30-day average
- —
- 30-day low
- —
- 30-day high
- —
- Sales 7d
- 0
- Sales 30d
- 0
No sales yet.
Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.
Text: Wikidata, CC BY-SA 4.0. ·
Related cards
Methods-time measurement
Procedures for analyzing work processes and determining planned and predefined times
Nº Q1925575 ★★
Standardization
Development and implementation of technical standards based on the consensus of different parties
Nº Q369577 ★★★
Build automation
Process of automating the creation of a software build that defines how to compile, package, and test the code
Nº Q2727468 ★
Mode of production
Marxist term for way of producing goods
Nº Q1548084 ★★★
Operations management
Area of management concerned with designing and controlling the process of production and redesigning business operations
Nº Q1423657 ★★
Material requirements planning
Production planning, scheduling, and inventory control system
Nº Q1365335 ★