Alto Train
Canada's proposed high-speed rail service
Nº Q115716080 ★★★
Rara · Organizaciones
Alto Train
Canada's proposed high-speed rail service
Alto (stylized in all caps) is a planned high-speed rail line in Canada, intended to connect major cities including Toronto, Ottawa, Montreal, and Quebec City. The planning and development of the line is being overseen by a federal Crown corporation operating under the same name (legally VIA HFR – VIA TGF Inc.) which is a wholly owned subsidiary of Via Rail Canada Inc. Announced by Prime Minister Justin Trudeau on February 19, 2025, Alto (previously Via HFR) will be co-developed by the private consortium Cadence (whose members include Keolis, S...
Último precio
—
Precio mínimo
—
Mediana 7 d
—
Ventas 30 d
0
Rango 30 d
—
En circulación
0
Cotización
mediana
mín – máx
ventas
Sin ventas en el periodo
Ver tabla
| Fecha | mediana | Mín | Máx | ventas |
|---|
Historial de ventas
- Última venta
- —
- Media 30 d
- —
- Mínimo 30 d
- —
- Máximo 30 d
- —
- Ventas 7 d
- 0
- Ventas 30 d
- 0
Aún no hay ventas.
Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.
En Wikipedia
Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.
Alto (stylized in all caps) is a planned high-speed rail line in Canada, intended to connect major cities including Toronto, Ottawa, Montreal, and Quebec City. The planning and development of the line is being overseen by a federal Crown corporation operating under the same name (legally VIA HFR – VIA TGF Inc.) which is a wholly owned subsidiary of Via Rail Canada Inc. Announced by Prime Minister Justin Trudeau on February 19, 2025, Alto (previously Via HFR) will be co-developed by the private consortium Cadence (whose members include Keolis, SNCF, and Air Canada) as part of a design phase that is estimated to cost $3.9 billion and is expected to last six years. The preliminary cost for the network estimated between $60 billion and $90 billion. After co-designing the network with Alto, Cadence will build, finance, operate, and maintain the publicly-owned network. The railway network will feature trains that will reach top speeds of 300 km/h (190 mph) or more (likely 320 km/h (200 mph)), much greater than that of Via Rail's current fastest services, which have a maximum operating speed of 100 mph (160 km/h) on select sections of track. The network is planned to consist of approximately 1,000 kilometres (620 mi) of new passenger-dedicated, mainly electrified track, and is expected to begin preliminary construction in 2029, with major construction beginning in 2030. The network will be built in phases, with the first phase from Ottawa and Montreal, with an intermediary station in Laval.
Texto: Wikipedia en inglés, CC BY-SA 4.0. ·