Ankeng light rail

Railway line in Taiwan

Nº Q10914168 ★★★

Rara · Lugares

Ankeng light rail

Railway line in Taiwan

Texto en inglés

The Ankeng light rail (Chinese: 安坑輕軌; pinyin: Ānkēng Qīngguǐ) (code K) is a light rail transit (LRT) line in Xindian District, New Taipei City, Taiwan, operated by New Taipei Metro. The route begins in Shuangcheng, terminating at Shisizhang where it links with the Circular line.

Último precio

—

Precio mínimo

—

Mediana 7 d

—

Ventas 30 d

0

Rango 30 d

—

En circulación

0

Cotización

Ver tabla
Fechamediana MínMáxventas

Historial de ventas

Última venta
—
Media 30 d
—
Mínimo 30 d
—
Máximo 30 d
—
Ventas 7 d
0
Ventas 30 d
0

Aún no hay ventas.

Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.

№ Ediciones numeradas · 0 acuñadas Próximo n.º 1 · Puntos ×3
En Wikipedia

Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.

The Ankeng light rail (Chinese: 安坑輕軌; pinyin: Ānkēng Qīngguǐ) (code K) is a light rail transit (LRT) line in Xindian District, New Taipei City, Taiwan, operated by New Taipei Metro. The route begins in Shuangcheng, terminating at Shisizhang where it links with the Circular line. The line is known in the New Taipei Metro system as the Khaki line, or line K. It opened on 10 February 2023 and began service the following day. The rolling stock for the line is produced in Taiwan. The trams on the Ankeng light rail are a partial battery-powered tram service, with some parts - especially the road running areas - battery powered while the rest is via overhead line electrification catenary at 750V DC. The line uses trams from the Taiwan Rolling Stock Company, most likely the same type of trams used for the Danhai light rail. Construction started around April 2016 on the road level part between Shuangcheng and Jinwen University of Science and Technology stations, with the first tracks laid in November 2018. A depot is located just past Shuangcheng station, near Antai Road. The depot is built on (or on the side of) a mountain, with a single bore tunnel capable of two tracks inside going through the mountain to arrive at Shuangcheng station, The train yard construction site is visible on Google Maps. As of September 2022, the line was 92.54% complete. As of December 2021, the elevated section was still under construction, although the Anxin bridge over the Xindian river was 98.13% completed. As of February 2022, the first trams had arrived and entered testing on the track. On February 10, 2023, the Ankeng LRT officially started operations and passengers could ride for free during the first month.

Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: 新北市政府 (Attribution) ·

Cartas cercanas

Confirmación