Bank Bridge

Bridge in St Petersburg, Russia

Bank Bridge (Russian: Bankovsky most, Банковский мост) is a 25 m (82 ft) long and 3.1 m (10 ft) wide single-span beam pedestrian bridge crossing the Griboyedov Canal near the former Russian Assignation Bank in Saint Petersburg, Russia. It connects Kazansky Island and Spassky Island in the city's Tsentralny District.

Nº Q1193149 ★★★

Rara · Arquitectura

Bank Bridge

Bridge in St Petersburg, Russia

Texto en inglés

Bank Bridge (Russian: Bankovsky most, Банковский мост) is a 25 m (82 ft) long and 3.1 m (10 ft) wide single-span beam pedestrian bridge crossing the Griboyedov Canal near the former Russian Assignation Bank in Saint Petersburg, Russia. It connects Kazansky Island and Spassky Island in the city's Tsentralny District.

En el mapa

Ver en OpenStreetMap · © los colaboradores de OpenStreetMap

Último precio

—

Precio mínimo

—

Mediana 7 d

—

Ventas 30 d

0

Rango 30 d

—

En circulación

0

Cotización

Ver tabla
Fechamediana MínMáxventas

Historial de ventas

Última venta
—
Media 30 d
—
Mínimo 30 d
—
Máximo 30 d
—
Ventas 7 d
0
Ventas 30 d
0

Aún no hay ventas.

Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.

№ Ediciones numeradas · 0 acuñadas Próximo n.º 1 · Puntos ×3
En Wikipedia

Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.

Bank Bridge (Russian: Bankovsky most, Банковский мост) is a 25 m (82 ft) long and 3.1 m (10 ft) wide single-span beam pedestrian bridge crossing the Griboyedov Canal near the former Russian Assignation Bank in Saint Petersburg, Russia. It connects Kazansky Island and Spassky Island in the city's Tsentralny District. The bridge is in front of, and takes its name from, the former Assignation Bank building (now housing the Saint Petersburg State University of Economics). The bridge was one of six suspension bridges built between 1823 and 1826. The design for the Bank Bridge, and another farther upstream (later known as the Bridge of Lions), were approved on 18 February 1825, with construction expected to be completed by October of that year. Difficulties during the construction process delayed completion until the middle of the following year. It opened on 24 July [N.S. 5 August] 1826, with more than 9,000 people crossing it on the opening day. The bridge engineer was Wilhelm von Traitteur, who conceived of a pedestrian separation structure suspended by cables. He was an engineer who also built other bridges over the Griboyedov Canal, Fontanka and Moika. The general management of the bridge construction was carried out by colonel E. A. Adam. The bridge has sculptures of four winged lions crowning the abutments. They were designed by sculptor Pavel Sokolov (1764–1835), who also contributed lions for Bridge of Lions and sphinxes for Egyptian Bridge. Casting the metal parts for the bridge was carried out by the Aleksandrovsky Iron Foundry, but the chains were delayed until December, and the lions until March 1826. The bridge began to be assembled in spring that year, with the Bridge of Lions opening on 1 July 1826, and the Bank Bridge on 24 July. von Traitteur wrote "regarding the lions and griffins themselves,...

Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: Vlad&Mirom (CC BY-SA 3.0) ·

Cartas cercanas

Ver la ficha

Confirmación