Daryan Dam

Dam In Iran

Nº Q5988871 ★★★★

Súper rara · Lugares

Daryan Dam

Dam In Iran

Texto en inglés

The Daryan Dam, also spelled Darian (Persian: سد داریان), is an embankment dam constructed on the Sirvan River just north of Daryan in Paveh County, Kermanshah province, Iran. The primary purpose of the dam is to supply up to 1,378,000,000 m3 (1,117,000 acre⋅ft) of water annually to the 48 km (30 mi) long Nowsud Water Conveyance Tunnel where it will irrigate areas of Southwestern Iran.

Último precio

—

Precio mínimo

—

Mediana 7 d

—

Ventas 30 d

0

Rango 30 d

—

En circulación

0

Cotización

Ver tabla
Fechamediana MínMáxventas

Historial de ventas

Última venta
—
Media 30 d
—
Mínimo 30 d
—
Máximo 30 d
—
Ventas 7 d
0
Ventas 30 d
0

Aún no hay ventas.

Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.

№ Ediciones numeradas · 0 acuñadas Próximo n.º 1 · Puntos ×3
En Wikipedia

Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.

The Daryan Dam, also spelled Darian (Persian: سد داریان), is an embankment dam constructed on the Sirvan River just north of Daryan in Paveh County, Kermanshah province, Iran. The primary purpose of the dam is to supply up to 1,378,000,000 m3 (1,117,000 acre⋅ft) of water annually to the 48 km (30 mi) long Nowsud Water Conveyance Tunnel where it will irrigate areas of Southwestern Iran. The dam also has a 210 MW hydroelectric power station. Construction on the dam began in 2009 and the dam began to fill its reservoir in late November 2015. The Darian Dam Archaeological Salvage Program (DDASP) was planned by Iranian Center for Archaeological Research before flooding the reservoir. As a result, a number of important archaeological sites were discovered and some were excavated. The power station was commissioned in 2018. The dam's diversion tunnel was completed in June 2011. The dam was designed by Quds Niru and consultation was provided by Mahab Ghods and Quds Niru, International Consulting Engineering Co. In August 2010 Farab Co. won the contract to build the power station. In 2011, workers on the project held a protest against unpaid wages. The dam is also the subject of protest due to the forced relocations and ecological/cultural impact its reservoir will have.

Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: Behzad Faraji (CC BY 4.0) ·

Cartas cercanas

Confirmación