Gary Works
Largest steel mill complex in North America
The Gary Works is a steel mill in Gary, Indiana, on the shore of Lake Michigan. For many years, the Gary Works was the world's largest steel mill, and it remains the largest integrated mill in North America. It is operated by U.S. Steel.
Nº Q5526198 ★★
Poco común · Organizaciones
Gary Works
Largest steel mill complex in North America
The Gary Works is a steel mill in Gary, Indiana, on the shore of Lake Michigan. For many years, the Gary Works was the world's largest steel mill, and it remains the largest integrated mill in North America. It is operated by U.S. Steel.
Último precio
—
Precio mínimo
—
Mediana 7 d
—
Ventas 30 d
0
Rango 30 d
—
En circulación
0
Cotización
mediana
mín – máx
ventas
Sin ventas en el periodo
Ver tabla
| Fecha | mediana | Mín | Máx | ventas |
|---|
Historial de ventas
- Última venta
- —
- Media 30 d
- —
- Mínimo 30 d
- —
- Máximo 30 d
- —
- Ventas 7 d
- 0
- Ventas 30 d
- 0
Aún no hay ventas.
Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.
En Wikipedia
Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.
The Gary Works is a steel mill in Gary, Indiana, on the shore of Lake Michigan. For many years, the Gary Works was the world's largest steel mill, and it remains the largest integrated mill in North America. It is operated by U.S. Steel. The Gary Works includes both steelmaking and finishing facilities as an integrated mill, and has an annual capacity of 8.2 million tons. It contains: Four blast furnaces Three top-blown basic oxygen process (BOP) vessels Three bottom-blown BOP (Q-BOP) vessels Vacuum degasser Three ladle metallurgy facilities Four continuous slab casters An 84-inch hot strip mill Hot-rolled temper mill 80- and 84-inch pickle lines A 52-inch six-stand and an 80-inch five-stand cold-reduction mills Electrolytic cleaning line Three batch annealing facilities A 38-inch continuous annealing line An 80-inch one-stand, a 48-inch two-stand, and an 84-inch two-stand temper mills A 48-inch two-stand double cold-reduction mill A 37-inch and a 46-inch electrolytic tinning lines Pig iron caster The Gary Works was under construction from 1906 to 1908, and the first shipment of iron ore was unloaded on June 23, 1908. About 11 million cubic feet (310,000 m3) of sand were moved in the process of constructing the plant. The Gary Works remains Gary's largest single employer and a key element of the city's tax base, but employment levels have fallen substantially since the mid-20th century; the plant and allied facilities employed over 30,000 people in the early 1970s, but only 6,000 in 1990, 5,000 in 2015, 2,500 in 2021, and 2,246 in 2023. The plant is also a central part of the city's geography; its main entrance is at the northern end of Broadway, the city's main thoroughfare.
Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: Grešla (CC BY-SA 4.0) ·
Cartas cercanas
Iron and steel industry in the United States
Nº Q25323750 ★
Illich Steel and Iron Works
Metallurgical facility in Mariupol, Ukraine
Nº Q4281587 ★★★
China Steel
Company in Taiwan
Nº Q712863 ★★
United Steelworkers
Industrial labor union in North America
Nº Q494197 ★
Iron and steel industry in India
Type of industry in India
Nº Q24943781 ★★
Magnitogorsk Iron and Steel Works
One of Russia's largest steel companies
Nº Q1884500 ★★★★