InterCity 225

High speed train in UK

Nº Q942987 ★

Común · Saberes

InterCity 225

High speed train in UK

Texto en inglés

The InterCity 225 is an electric push-pull high speed train in Great Britain, each originally comprising a Class 91 electric locomotive, nine Mark 4 coaches and a Driving Van Trailer (DVT). The Class 91 locomotives were built by British Rail Engineering Limited's Crewe Works as a spin-off from the Advanced Passenger Train (APT) project, which was abandoned during the 1980s, whilst the coaches and DVT were constructed by Metro-Cammell in Birmingham and Breda (under sub-contract) in Italy, again borrowing heavily from the APT.

Último precio

—

Precio mínimo

—

Mediana 7 d

—

Ventas 30 d

0

Rango 30 d

—

En circulación

0

Cotización

Ver tabla
Fechamediana MínMáxventas

Historial de ventas

Última venta
—
Media 30 d
—
Mínimo 30 d
—
Máximo 30 d
—
Ventas 7 d
0
Ventas 30 d
0

Aún no hay ventas.

Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.

En Wikipedia

Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.

The InterCity 225 is an electric push-pull high speed train in Great Britain, each originally comprising a Class 91 electric locomotive, nine Mark 4 coaches and a Driving Van Trailer (DVT). The Class 91 locomotives were built by British Rail Engineering Limited's Crewe Works as a spin-off from the Advanced Passenger Train (APT) project, which was abandoned during the 1980s, whilst the coaches and DVT were constructed by Metro-Cammell in Birmingham and Breda (under sub-contract) in Italy, again borrowing heavily from the APT. The trains were designed to operate at up to 140 mph (225 km/h) in regular service, but are limited to 125 mph (200 km/h) principally due to a lack of cab signalling and the limitations of the current overhead line equipment. They were introduced into service between 1989 and 1991 for inter-city services on the East Coast Main Line (ECML) from London King's Cross to Leeds, York and Edinburgh Waverley. In late 2025, the remaining sets in use were reduced to seven carriages in order that they could keep to the timings for LNER's new timetable.

Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: Oxyman (CC BY 2.5) ·

Cartas cercanas

Confirmación