Lucknow Metro
Metro rail system in Lucknow
The Lucknow Metro is a mass rapid transit (MRT) system in Lucknow, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). The frequency of the metro's services is around 5 - 7 minutes.
Nº Q6697779 ★★
Poco común · Lugares
Lucknow Metro
Metro rail system in Lucknow
The Lucknow Metro is a mass rapid transit (MRT) system in Lucknow, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). The frequency of the metro's services is around 5 - 7 minutes.
En el mapa
Último precio
—
Precio mínimo
—
Mediana 7 d
—
Ventas 30 d
0
Rango 30 d
—
En circulación
0
Cotización
mediana
mín – máx
ventas
Sin ventas en el periodo
Ver tabla
| Fecha | mediana | Mín | Máx | ventas |
|---|
Historial de ventas
- Última venta
- —
- Media 30 d
- —
- Mínimo 30 d
- —
- Máximo 30 d
- —
- Ventas 7 d
- 0
- Ventas 30 d
- 0
Aún no hay ventas.
Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.
En Wikipedia
Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.
The Lucknow Metro is a mass rapid transit (MRT) system in Lucknow, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). The frequency of the metro's services is around 5 - 7 minutes. Along with Delhi Meerut RRTS, Meerut Metro, Noida-Greater Noida Metro, Kanpur Metro and Agra Metro, it is one of the 5 operational metro networks in Uttar Pradesh. It is the 3rd largest urban transit system in Uttar Pradesh after Delhi Meerut RRTS and Noida Metro. Construction of the Phase 1A line began on 27 September 2014 with the 8.5 km (5.3 mi) stretch from Transport Nagar to Charbagh which began its commercial operation on 5 September 2017. Full operation on Red Line stretch from CCS International Airport to Munshi Pulia began operation on 9 March 2019. The Lucknow metro project is the most expensive transport system in Uttar Pradesh to date with an estimated total cost for Phase 1A (Red Line) and 1B (Blue Line) of about $2 billion, of which ₹6,928 crore (US$720 million) was spent on phase 1A. The Government of Uttar Pradesh Approved the construction of the 11.165 km long East-West Corridor between Vasant Kunj to Charbagh, Phase 1B Blue Line at an estimated budget of ₹5,881 crore (US$610 million) in January 2024. Lucknow Metro achieved its highest ever ridership of 1.30 lakh passengers since its inception in 2017 on 1 January 2024 which surpassed the previous record of 93,237 passengers set on 25 December 2023.
Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: Wikiboy2364 (CC BY-SA 4.0) ·
Cartas cercanas
Agra Metro
Mass rapid transit system in the city of Agra, India
Nº Q24088780 ★★
Kanpur Metro
Rapid transit system in Kanpur, Uttar Pradesh
Nº Q17063873 ★★
Meerut Metro
Rapid transit system
Nº Q28170016 ★
Meerut
Ciudad de la India
Nº Q200237 ★★★
Noida Metro
Rapid transit system serving Noida and Greater Noida in the National Capital Region of India
Nº Q16909221 ★★
Lucknow
Capital del estado de Uttar Pradesh, India
Nº Q47916 ★★★★