REM de l'Est
Cancelled public transport project in Montreal
The REM de l'Est (French: [ʁɛm də lɛst]; lit. "Eastern REM") was a project of eastward expansion of the Réseau express métropolitain (REM), the developing light metro network serving the metropolitan area of Montreal, Quebec, Canada.
Nº Q109042969 ★★★
Rara · Historia
REM de l'Est
Cancelled public transport project in Montreal
The REM de l'Est (French: [ʁɛm də lɛst]; lit. "Eastern REM") was a project of eastward expansion of the Réseau express métropolitain (REM), the developing light metro network serving the metropolitan area of Montreal, Quebec, Canada.
Último precio
—
Precio mínimo
—
Mediana 7 d
—
Ventas 30 d
0
Rango 30 d
—
En circulación
0
Cotización
mediana
mín – máx
ventas
Sin ventas en el periodo
Ver tabla
| Fecha | mediana | Mín | Máx | ventas |
|---|
Historial de ventas
- Última venta
- —
- Media 30 d
- —
- Mínimo 30 d
- —
- Máximo 30 d
- —
- Ventas 7 d
- 0
- Ventas 30 d
- 0
Aún no hay ventas.
Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.
En Wikipedia
Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.
The REM de l'Est (French: [ʁɛm də lɛst]; lit. "Eastern REM") was a project of eastward expansion of the Réseau express métropolitain (REM), the developing light metro network serving the metropolitan area of Montreal, Quebec, Canada. Announced on December 15, 2020, the project was to be built by CDPQ Infra, the institutional investor behind the original REM and the infrastructure subsidiary of Quebec's public pension fund manager, the Caisse de dépôt et placement du Québec (CDPQ). Spanning 32 km (19.88 mi) and 23 stations, the REM de l'Est would have expanded rapid transit coverage of Montreal's East Island, an area generally considered underserved by public transport. The automated light metro system would have linked downtown Montreal to Pointe-aux-Trembles, on the eastern tip of the island, and to Montréal-Nord, in the northeast. With its estimated cost of $10 billion, it would have been the largest investment in public transport in Quebec history. While polling indicated local favourability to the project, it was prominently criticized for its majority use of elevated rail, especially in a downtown section over René-Lévesque Boulevard, which generated concerns of urban disfigurement, fragmentation and noise pollution. On May 2, 2022, the Quebec and Montreal governments abandoned the idea of a downtown link, leading CDPQ Infra to back out of the project. The REM de l'Est was immediately replaced by the Projet structurant de l'Est (PSE, lit. 'Eastern Structuring Project'), an expansion project now being helmed by Montreal's regional transport agency, the Autorité régionale de transport métropolitain (ARTM). While it initially kept being referred to as the "REM de l'Est" in media, the PSE has moved away significantly from its predecessor and is now planned as a tramway system.
Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: WikiFouf (CC0) ·
Cartas cercanas
Réseau express métropolitain
Sistema de tránsito rápido en el área del Gran Montreal
Nº Q19582331 ★★★
Quebec City tramway
Quebec City’s tramway
Nº Q3537177 ★★★
Outaouais
Región administrativa de Quebec, Canadá
Nº Q222948 ★★★
Red Line (Montreal Metro)
Proposed line of the Montreal Metro that was never built
Nº Q25397094 ★★★
Caja de Depósitos e Inversiones de Quebec
Nº Q2933291 ★★★
Télé-Québec
Nº Q3546513 ★★★