Front-end loading

Project Development Methodology

Texte en anglais

Front-end loading (FEL), also referred to as Front-End Engineering Design (FEED), Front End Planning (FEP), pre-project planning (PPP), and early project planning, is the process for conceptual development of projects in processing industries such as upstream oil and gas, petrochemical, natural gas refining, extractive metallurgy, waste-to-energy, biotechnology, and pharmaceuticals. This involves developing sufficient strategic information with which owners can address risk and make decisions to commit resources in order to maximize the potenti...

Sur Wikipédia

Texte en anglais Pas encore d'article dans ta langue : extrait en anglais.

Front-end loading (FEL), also referred to as Front-End Engineering Design (FEED), Front End Planning (FEP), pre-project planning (PPP), and early project planning, is the process for conceptual development of projects in processing industries such as upstream oil and gas, petrochemical, natural gas refining, extractive metallurgy, waste-to-energy, biotechnology, and pharmaceuticals. This involves developing sufficient strategic information with which owners can address risk and make decisions to commit resources in order to maximize the potential for success. Front-end loading includes robust planning and design early in a project's lifecycle (i.e., the front end of a project), at a time when the ability to influence changes in design is relatively high and the cost to make those changes is relatively low. It typically applies to industries with highly capital intensive, long lifecycle projects (i.e., hundreds of millions or billions of dollars over several years before any revenue is produced). Although it often adds a small amount of time and cost to the early portion of a project, these factors are minor compared to the alternative of the costs and effort required to make changes at a later stage in the project. It also typically uses a stage-gate process, whereby a project must pass through formal gates at well defined milestones within the project's lifecycle before receiving funding to proceed to the next stage of work. The quality of front-end planning can be improved through the use of PDRI (Project Definition Rating Index) as a part of the stage-gate process. Front-end loading is usually followed by detailed design or detailed engineering.

Texte : Wikipédia en anglais, CC BY-SA 4.0. ·

Cartes voisines

Ouvrir

…

Touche pour fermer

Confirmation