Next Generation Squad Weapon
US Military program to replace M4, M249 and M240 battle rifles
Nº Q108684919 ★★★
Rare · Histoire
Next Generation Squad Weapon
US Military program to replace M4, M249 and M240 battle rifles
The Next Generation Squad Weapon (NGSW) program is a United States military program created in 2017 by the U.S. Army to replace the 5.56mm M4 carbine, the M249 SAW light machine gun, and the 7.62mm M240 machine gun, with a common system of 6.8mm cartridges and to develop small arms fire-control systems for the new weapons. Seven defense manufacturers competed in the program, with five attempting to design and produce the weapons and two attempting to create and supply fire-control optics.
Dernier prix
—
Prix plancher
—
Médiane 7 j
—
Ventes 30 j
0
Fourchette 30 j
—
En circulation
0
Cours
médiane
min – max
ventes
Aucune vente sur la période
Voir le tableau
| Date | médiane | Min | Max | ventes |
|---|
Historique des ventes
- Dernière vente
- —
- Moyenne 30 j
- —
- Plus bas 30 j
- —
- Plus haut 30 j
- —
- Ventes 7 j
- 0
- Ventes 30 j
- 0
Aucune vente pour l'instant.
Ventes anonymes : ni acheteur ni vendeur. Les chiffres ne comptent que les ventes entre joueurs.
Sur Wikipédia
Texte en anglais Pas encore d'article dans ta langue : extrait en anglais.
The Next Generation Squad Weapon (NGSW) program is a United States military program created in 2017 by the U.S. Army to replace the 5.56mm M4 carbine, the M249 SAW light machine gun, and the 7.62mm M240 machine gun, with a common system of 6.8mm cartridges and to develop small arms fire-control systems for the new weapons. Seven defense manufacturers competed in the program, with five attempting to design and produce the weapons and two attempting to create and supply fire-control optics. The winners were officially announced by the Army in early 2022: SIG Sauer to produce the XM7 rifle and XM250 automatic rifle, Vortex Optics to produce the XM157 fire-control system, and Winchester to produce the custom 6.8×51mm Common Cartridge ammunition designed by SIG Sauer. The program was expected to cost $10 million in the first year of production, and $150 million the next.
Texte : Wikipédia en anglais, CC BY-SA 4.0. · Image : U.S. Army Acquisition Support Center (Public domain) ·