Purple Line

Ligne de métro léger de Washington en construction

Nº Q7261432 ★★★

Rare · Lieux

Purple Line

Ligne de métro léger de Washington en construction

Texte en anglais

The Purple Line is a 16.2-mile (26.1 km) light rail line being built to link several Maryland suburbs of Washington, D.C.: Bethesda, Silver Spring, College Park, and New Carrollton. Slated to open in late 2027, the line will enable riders to move between the Maryland branches of the Red, Green, Yellow, Silver, and Orange lines of the Washington Metro, and between all three lines of the MARC commuter rail system, without riding into central Washington.

Dernier prix

—

Prix plancher

—

Médiane 7 j

—

Ventes 30 j

0

Fourchette 30 j

—

En circulation

0

Cours

Voir le tableau
Datemédiane MinMaxventes

Historique des ventes

Dernière vente
—
Moyenne 30 j
—
Plus bas 30 j
—
Plus haut 30 j
—
Ventes 7 j
0
Ventes 30 j
0

Aucune vente pour l'instant.

Ventes anonymes : ni acheteur ni vendeur. Les chiffres ne comptent que les ventes entre joueurs.

№ Éditions numérotées · 0 frappées Prochain n° 1 · Score ×3
Sur Wikipédia

Texte en anglais Pas encore d'article dans ta langue : extrait en anglais.

The Purple Line is a 16.2-mile (26.1 km) light rail line being built to link several Maryland suburbs of Washington, D.C.: Bethesda, Silver Spring, College Park, and New Carrollton. Slated to open in late 2027, the line will enable riders to move between the Maryland branches of the Red, Green, Yellow, Silver, and Orange lines of the Washington Metro, and between all three lines of the MARC commuter rail system, without riding into central Washington. The project is administered by the Maryland Transit Administration (MTA), an agency of the Maryland Department of Transportation (MDOT), and not the Washington Metropolitan Area Transit Authority (WMATA), which operates Metro. Throughout its decades-long planning process, the project was dogged by resistance, particularly from residents of the upscale community of Chevy Chase and members of the Columbia Country Club. From 2003 to 2006, Maryland Governor Robert Ehrlich changed the proposed mode of transportation from light rail to bus rapid transit. Legal attempts to thwart the line continued even after construction had begun; but in December 2017, the U.S. Court of Appeals for the D.C. Circuit ruled that Purple Line construction could continue despite these objections. In 2016, a consortium headed by Fluor Enterprises won the $5.6 billion PPP contract to design and build the Purple Line, then to operate and maintain it for 36 years. Construction began in August 2017. Work halted in September 2020, when the consortium withdrew from the contract, citing mounting delays and disputes with the state government. The project had already consumed $1.1 billion of the anticipated $2 billion construction cost. A new general contractor was selected in November 2021, and a new contract was signed in April 2022. This new agreement added $3.7 billion to the total cost of building, running, and maintaining the Purple Line for 30 years, bringing...

Texte : Wikipédia en anglais, CC BY-SA 4.0. · Image : Elvert Barnes (CC BY-SA 2.0) ·

Cartes voisines

Confirmation