voie rapide S19

Voie rapide en Pologne

Expressway S19 or express road S19 (pl. droga ekspresowa S19) is a Polish freeway which has been planned to run from the border crossing with Belarus in Kuźnica, through Białystok, Lublin and Rzeszów, to the border with Slovakia in Barwinek, where it will connect with the future R4 expressway. The road is part of the Via Carpatia route.

Nº Q1259532 ★★

Peu commune · Lieux

voie rapide S19

Voie rapide en Pologne

Texte en anglais

Expressway S19 or express road S19 (pl. droga ekspresowa S19) is a Polish freeway which has been planned to run from the border crossing with Belarus in Kuźnica, through Białystok, Lublin and Rzeszów, to the border with Slovakia in Barwinek, where it will connect with the future R4 expressway. The road is part of the Via Carpatia route.

Dernier prix

—

Prix plancher

—

Médiane 7 j

—

Ventes 30 j

0

Fourchette 30 j

—

En circulation

0

Cours

Voir le tableau
Datemédiane MinMaxventes

Historique des ventes

Dernière vente
—
Moyenne 30 j
—
Plus bas 30 j
—
Plus haut 30 j
—
Ventes 7 j
0
Ventes 30 j
0

Aucune vente pour l'instant.

Ventes anonymes : ni acheteur ni vendeur. Les chiffres ne comptent que les ventes entre joueurs.

Sur Wikipédia

Texte en anglais Pas encore d'article dans ta langue : extrait en anglais.

Expressway S19 or express road S19 (pl. droga ekspresowa S19) is a Polish freeway which has been planned to run from the border crossing with Belarus in Kuźnica, through Białystok, Lublin and Rzeszów, to the border with Slovakia in Barwinek, where it will connect with the future R4 expressway. The road is part of the Via Carpatia route. Its total planned length is 570 km (350 mi). As of 2026, the 189.5-km long section between Lublin and Rzeszów (including bypasses of both cities) is complete. On the remaining sections the bypasses of several towns are operational, while it is projected that all the remaining parts of the road should be opened to traffic between 2026 and 2032. During the planning of the road, it was debated how much of it should be dual carriageway and how much single carriageway with 3 lanes in interchanging profile of 2+1 lanes. The first section of the road north of Rzeszów was constructed in such half-profile (with the allocated space reservation for adding the second carriageway later). As the traffic volumes in Poland continued to grow, it was decided that the whole length of S19 will be dual carriageway; the section north of Rzeszów will have the second carriageway constructed by 2026.

Texte : Wikipédia en anglais, CC BY-SA 4.0. · Image : Szater (CC BY-SA 4.0) ·

Cartes voisines

Voir la fiche

Confirmation