Brighton Main Line

Railway line between London and Brighton

The Brighton Main Line is a railway line in southern England linking London to Brighton. It starts at two termini in the capital, London Victoria and London Bridge, and the branches from each meet at East Croydon, from where the route continues southwards via Gatwick Airport to the coast.

Nº Q2663638 ★★

Incomum · Lugares

Brighton Main Line

Railway line between London and Brighton

Texto em inglês

The Brighton Main Line is a railway line in southern England linking London to Brighton. It starts at two termini in the capital, London Victoria and London Bridge, and the branches from each meet at East Croydon, from where the route continues southwards via Gatwick Airport to the coast.

Último preço

—

Preço mínimo

—

Mediana 7 d

—

Vendas 30 d

0

Faixa 30 d

—

Em circulação

0

Cotação

Ver tabela
Datamediana MínMáxvendas

Histórico de vendas

Última venda
—
Média 30 d
—
Mínima 30 d
—
Máxima 30 d
—
Vendas 7 d
0
Vendas 30 d
0

Ainda sem vendas.

Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.

Na Wikipédia

Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.

The Brighton Main Line is a railway line in southern England linking London to Brighton. It starts at two termini in the capital, London Victoria and London Bridge, and the branches from each meet at East Croydon, from where the route continues southwards via Gatwick Airport to the coast. The line serves the suburbs of South London, as well as the towns of Redhill, Horley, Crawley, Haywards Heath and Burgess Hill. The distance from the London termini to Brighton is around 50 mi (80 km) and the fastest end-to-end journey time is about an hour. A variety of passenger services runs on the line, including limited-stop airport expresses, semi-fast regional and outer-suburban trains, and shorter-distance commuter services. These are operated by Govia Thameslink Railway (Gatwick Express, Southern and Thameslink), Transport for London (London Overground) and Great Western Railway. The first part of the Brighton Main Line to be built was the section from London Bridge to Croydon, which was opened by the London and Croydon Railway (L&CR) in 1839. Two years later, a separate company, the London and Brighton Railway (L&BR), extended the line to the south coast. In 1846, the L&CR and the L&BR merged to form the London, Brighton and South Coast Railway (LB&SCR), which began to run trains to London Victoria via the West End of London and Crystal Palace Railway in 1848. The Brighton Main Line was completed in December 1862, when the LB&SCR opened the direct route between Croydon and Victoria via Thornton Heath. The Brighton Main Line is electrified using the 750 V DC third-rail system and the majority of the route has four tracks. There are seven tunnels, including two on the Quarry Line, which allows express services to bypass the junctions at Redhill station. The most serious accident on the Brighton Main...

Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Ian Cunliffe (CC BY-SA 2.0) ·

Cartas próximas

Ver a ficha

Confirmação