Circular light rail
Circular light rail line of Kaohsiung Mass Rapid Transit
Nº Q4121246 ★★★
Rara · Lugares
Circular light rail
Circular light rail line of Kaohsiung Mass Rapid Transit
The Kaohsiung Circular Light Rail (Chinese: 高雄環狀輕軌; pinyin: Gāoxióng huán zhuàng qīngguǐ; Pe̍h-ōe-jī: Ko-hiông Khoân-chōng Khing-khùi) is a light rail loop line in Kaohsiung, Taiwan, operated by the Kaohsiung Rapid Transit Corporation. The line stretches over a length of 22.1 kilometers and has 38 stations.
Último preço
—
Preço mínimo
—
Mediana 7 d
—
Vendas 30 d
0
Faixa 30 d
—
Em circulação
0
Cotação
mediana
mín – máx
vendas
Sem vendas no período
Ver tabela
| Data | mediana | Mín | Máx | vendas |
|---|
Histórico de vendas
- Última venda
- —
- Média 30 d
- —
- Mínima 30 d
- —
- Máxima 30 d
- —
- Vendas 7 d
- 0
- Vendas 30 d
- 0
Ainda sem vendas.
Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.
Na Wikipédia
Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.
The Kaohsiung Circular Light Rail (Chinese: 高雄環狀輕軌; pinyin: Gāoxióng huán zhuàng qīngguǐ; Pe̍h-ōe-jī: Ko-hiông Khoân-chōng Khing-khùi) is a light rail loop line in Kaohsiung, Taiwan, operated by the Kaohsiung Rapid Transit Corporation. The line stretches over a length of 22.1 kilometers and has 38 stations. The southern part of this line makes use of the defunct tracks of the Kaohsiung Harbor Railway Line. Construction cost was forecasted to be 16.5 billion New Taiwan dollars. Phase I consists of the section of the line from Station C1 to Station C14, of which Stations C3 and C14 are transfer stations to the KMRT Red line and Orange line, respectively. Construction of Phase I began on 4 June 2013. Stations C1 to C14 were open on a test-basis (free for the public) from August 2015, and commenced formal operations in September 2017. Phase II construction of the northern section partially began on 12 January 2021 after the underground relocation of the Kaohsiung urban railway. The northern part of Phase II was scheduled to be opened in June 2021 along with the rest, but was delayed until 1 January 2024 due to local opposition.
Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: KasugaHuang (CC BY-SA 4.0) ·