Circumvesuviana

Italian railway network

Circumvesuviana (Italian pronunciation: [ˌtʃirkuɱvezuˈvjaːna]) is a 142-kilometre-long (88 mi) railway network in the east of the Naples metropolitan area, operated by EAV. Electrically powered throughout, the system uses the narrow gauge of 950 mm (3 ft 1+3⁄8 in) and operates 142 km (88 mi) of route on six lines.

Nº Q867565 ★★★★

Super rara · Organizações

Circumvesuviana

Italian railway network

Texto em inglês

Circumvesuviana (Italian pronunciation: [ˌtʃirkuɱvezuˈvjaːna]) is a 142-kilometre-long (88 mi) railway network in the east of the Naples metropolitan area, operated by EAV. Electrically powered throughout, the system uses the narrow gauge of 950 mm (3 ft 1+3⁄8 in) and operates 142 km (88 mi) of route on six lines.

Último preço

—

Preço mínimo

—

Mediana 7 d

—

Vendas 30 d

0

Faixa 30 d

—

Em circulação

0

Cotação

Ver tabela
Datamediana MínMáxvendas

Histórico de vendas

Última venda
—
Média 30 d
—
Mínima 30 d
—
Máxima 30 d
—
Vendas 7 d
0
Vendas 30 d
0

Ainda sem vendas.

Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.

№ Edições numeradas · 0 cunhadas Próximo n.º 1 · Pontos ×3
Na Wikipédia

Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.

Circumvesuviana (Italian pronunciation: [ˌtʃirkuɱvezuˈvjaːna]) is a 142-kilometre-long (88 mi) railway network in the east of the Naples metropolitan area, operated by EAV. Electrically powered throughout, the system uses the narrow gauge of 950 mm (3 ft 1+3⁄8 in) and operates 142 km (88 mi) of route on six lines. It is entirely separate from other national and regional railway lines. It has 96 stations with an average interstation distance of 1.5 km (0.9 mi). The Circumvesuviana railway covers a wide catchment area of over 2 million people, distributed in 47 municipalities, including Scafati, San Valentino Torio and Sarno in the province of Salerno and Avella and Baiano in the province of Avellino. The network forms an important commercial artery, and provides services to the tourist destinations of Pompeii and Herculaneum. All routes start from the Napoli Porta Nolana terminus near the Porta Nolana, and pass through Napoli Garibaldi station before splitting into several branches to towns in the province. A journey along the entirety of the longest route, the 47 km (29 mi) from Naples to Sorrento, takes about one hour. In 2024, the railway network transported approximately 23 million passengers.

Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Francescosorrentino7 (CC BY 4.0) ·

Cartas próximas

Ver a ficha

Confirmação