Gateway Program (Northeast Corridor)

Railroad infrastructure improvement project in New York and New Jersey, US

The Gateway Program is an ongoing expansion and renovation of the Northeast Corridor (NEC) rail line between Newark, New Jersey, and New York City along the right-of-way between Newark Penn Station and New York Penn Station. The project is intended to build new rail bridges in the New Jersey Meadowlands, dig a new set of tunnels under Bergen Hill (Hudson Palisades) and the Hudson River, and rehabilitate the existing 1910 tunnel, all with the goal of doubling train capacity to four tracks along the right-of-way, since the current two-track rail...

Nº Q5527276 ★★

Incomum · História

Gateway Program (Northeast Corridor)

Railroad infrastructure improvement project in New York and New Jersey, US

Texto em inglês

The Gateway Program is an ongoing expansion and renovation of the Northeast Corridor (NEC) rail line between Newark, New Jersey, and New York City along the right-of-way between Newark Penn Station and New York Penn Station. The project is intended to build new rail bridges in the New Jersey Meadowlands, dig a new set of tunnels under Bergen Hill (Hudson Palisades) and the Hudson River, and rehabilitate the existing 1910 tunnel, all with the goal of doubling train capacity to four tracks along the right-of-way, since the current two-track rail...

Último preço

—

Preço mínimo

—

Mediana 7 d

—

Vendas 30 d

0

Faixa 30 d

—

Em circulação

0

Cotação

Ver tabela
Datamediana MínMáxvendas

Histórico de vendas

Última venda
—
Média 30 d
—
Mínima 30 d
—
Máxima 30 d
—
Vendas 7 d
0
Vendas 30 d
0

Ainda sem vendas.

Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.

Na Wikipédia

Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.

The Gateway Program is an ongoing expansion and renovation of the Northeast Corridor (NEC) rail line between Newark, New Jersey, and New York City along the right-of-way between Newark Penn Station and New York Penn Station. The project is intended to build new rail bridges in the New Jersey Meadowlands, dig a new set of tunnels under Bergen Hill (Hudson Palisades) and the Hudson River, and rehabilitate the existing 1910 tunnel, all with the goal of doubling train capacity to four tracks along the right-of-way, since the current two-track rail line, used both by Amtrak and NJ Transit Rail Operations (NJT), has reached its full capacity of 24 trains per hour. It was unveiled as the Gateway Project in 2011, one year after the cancellation of the somewhat similar Access to the Region's Core (ARC) project. The need for renovations increased after Hurricane Sandy damaged the North River Tunnels the following year. It took nearly a decade to line up funding and regulatory approval for the biggest component, the new Hudson River tunnel, which began construction in 2023 and is scheduled to open in 2035, with rehabilitation of the old tunnels to follow by 2038. Other components that will complete the full four-track buildout between Newark Penn Station and New York, like the replacement Sawtooth Bridges, are in the planning stage, while some like the Portal South bridge still await commitments and funding.

Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Metropolitan Transportation Authority of the State of New Yo... (CC BY 2.0) ·

Cartas próximas

Ver a ficha

Confirmação