Getlink

European private company, Channel Tunnel infrastructure concessionaire until 2086

Getlink S.E., formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between France and the United Kingdom, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel (Eurostar passenger and DB Schenker freight). Groupe Eurotunnel was established on 13 August 1986 to finance, build, and operate the Channel Tunnel under a concession granted by the French and British governments.

Nº Q2274634 ★★★

Rara · Organizações

Getlink

European private company, Channel Tunnel infrastructure concessionaire until 2086

Texto em inglês

Getlink S.E., formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between France and the United Kingdom, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel (Eurostar passenger and DB Schenker freight). Groupe Eurotunnel was established on 13 August 1986 to finance, build, and operate the Channel Tunnel under a concession granted by the French and British governments.

Último preço

—

Preço mínimo

—

Mediana 7 d

—

Vendas 30 d

0

Faixa 30 d

—

Em circulação

0

Cotação

Ver tabela
Datamediana MínMáxvendas

Histórico de vendas

Última venda
—
Média 30 d
—
Mínima 30 d
—
Máxima 30 d
—
Vendas 7 d
0
Vendas 30 d
0

Ainda sem vendas.

Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.

№ Edições numeradas · 0 cunhadas Próximo n.º 1 · Pontos ×3
Na Wikipédia

Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.

Getlink S.E., formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between France and the United Kingdom, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel (Eurostar passenger and DB Schenker freight). Groupe Eurotunnel was established on 13 August 1986 to finance, build, and operate the Channel Tunnel under a concession granted by the French and British governments. The tunnel was constructed between 1988 and 1994 by TransManche Link (TML) under a contract issued by Groupe Eurotunnel; construction costs would overrun considerably, from TML's original estimate of £4.7 billion to the final cost of £9.5 billion. On 6 May 1994, the completed tunnel was officially opened. Its rail infrastructure comprises 50.45 kilometres (31.35 miles) of double track railway in the main tunnels, plus extensive surface-level terminal facilities at Folkestone in England and Calais in France. The rail network for operation of the Eurotunnel Shuttle train services is entirely self-contained, with connections near the two terminals to the respective national railway networks. Signalling and electric traction supply are also under Getlink control. In 1995, a loss of £925 million was reported by Groupe Eurotunnel; this was partly due to many of the planned services to use the tunnel not yet being permitted. On 2 August 2006, following failed debt restructuring plans, Groupe Eurotunnel was placed into bankruptcy protection; a restructuring plan that involved a £2.8 billion funding arrangement and a debt-for-equity swap was approved by shareholders in May 2007. That same year, it reported a net profit of €1 million, the company's first profitable year. In December 2009, Groupe Eurotunnel and SNCF acquired the French rail freight operator Veolia Cargo, gaining multiple subsidiaries in the process. In June 2010, the company acquired...

Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Tangopaso (Public domain) ·

Cartas próximas

Ver a ficha

Confirmação