Karun-4 Dam
Dam in Chaharmahal and Bakhtiari Province, Iran
Nº Q1504844 ★★★★
Super rara · Arquitetura
Karun-4 Dam
Dam in Chaharmahal and Bakhtiari Province, Iran
The Karun-4 Dam (Persian: سد کارون ۴) is an arch dam on the Karun River located 180 km southwest of Shahr-e Kord in the province of Chaharmahal and Bakhtiari, Iran. The Karun has the highest discharge of all the Iranian rivers.
Último preço
—
Preço mínimo
—
Mediana 7 d
—
Vendas 30 d
0
Faixa 30 d
—
Em circulação
0
Cotação
mediana
mín – máx
vendas
Sem vendas no período
Ver tabela
| Data | mediana | Mín | Máx | vendas |
|---|
Histórico de vendas
- Última venda
- —
- Média 30 d
- —
- Mínima 30 d
- —
- Máxima 30 d
- —
- Vendas 7 d
- 0
- Vendas 30 d
- 0
Ainda sem vendas.
Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.
Na Wikipédia
Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.
The Karun-4 Dam (Persian: سد کارون ۴) is an arch dam on the Karun River located 180 km southwest of Shahr-e Kord in the province of Chaharmahal and Bakhtiari, Iran. The Karun has the highest discharge of all the Iranian rivers. Its construction is aimed at generating hydroelectric power supply of 2,107 million kWh annually and controlling floods in the upper Karun. The dam is a concrete double curvature arch-type and 230 metres (750 ft) high from the foundation. The arch dam design is an ideal one for a dam built in a narrow, rocky gorge to hold back water in a reservoir. The dam is curved. Because of the arch shape, the force of the backed up water presses downward against the dam and has the effect of strengthening the dam foundation. The dam withholds a reservoir with a surface area of 29 square kilometres (11 sq mi) and capacity of 2.19 cubic kilometres (1,780,000 acre⋅ft). The dam's first study was conducted in 1995 and river diversion began in 1997. Concrete pouring began in 2006 and the power plant began producing electricity in November 2010. On 11 December 2010, the second generator for the dam became operational and was connected to the grid. The dam will eventually have an installed capacity of 1,020 MW. The dam was inaugurated on 6 July 2011 by Iranian President Mahmoud Ahmadinejad.
Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: M samadi (CC BY-SA 3.0) ·