Load factor (electrical)

The average power divided by the peak power over a period of time

In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load factor. f L o a d = Average Load Maximum load in given time period {\displaystyle f_{Load}={\frac {\text{Average Load}}{\text{Maximum load in given time perio...

Nº Q17099407 ★

Comum · Literatura

Load factor (electrical)

The average power divided by the peak power over a period of time

Texto em inglês

In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load factor. f L o a d = Average Load Maximum load in given time period {\displaystyle f_{Load}={\frac {\text{Average Load}}{\text{Maximum load in given time perio...

Último preço

—

Preço mínimo

—

Mediana 7 d

—

Vendas 30 d

0

Faixa 30 d

—

Em circulação

0

Cotação

Ver tabela
Datamediana MínMáxvendas

Histórico de vendas

Última venda
—
Média 30 d
—
Mínima 30 d
—
Máxima 30 d
—
Vendas 7 d
0
Vendas 30 d
0

Ainda sem vendas.

Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.

Na Wikipédia

Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.

In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load factor. f L o a d = Average Load Maximum load in given time period {\displaystyle f_{Load}={\frac {\text{Average Load}}{\text{Maximum load in given time period}}}} An example, using a large commercial electrical bill: peak demand = 436 kW use = 57200 kWh number of days in billing cycle = 30 d Hence: load factor = ( [ 57200 kWh / {30 d × 24 h/d} ] / 436 kW ) × 100% = 18.22% It can be derived from the load profile of the specific device or system of devices. Its value is always less than one because maximum demand is never lower than average demand, since facilities likely never operate at full capacity for the duration of an entire 24-hour day. A high load factor means power usage is relatively constant. Low load factor shows that occasionally a high demand is set. To service that peak, capacity is sitting idle for long periods, thereby imposing higher costs on the system. Electrical rates are designed so that customers with high load factor are charged less overall per kWh. This process along with others is called load balancing or peak shaving. The load factor is closely related to and often confused with the demand factor. f D e m a n d = Maximum load in given time period Maximum possible load {\displaystyle f_{Demand}={\frac {\text{Maximum load in given time period}}{\text{Maximum possible load}}}} The major difference to note is...

Texto: Wikipédia em inglês, CC BY-SA 4.0. ·

Cartas próximas

Ver a ficha

Confirmação