Lockheed AH-56 Cheyenne

1967 attack helicopter series by Lockheed

The Lockheed AH-56 Cheyenne is an attack helicopter developed by Lockheed for the United States Army. It rose from the Army's Advanced Aerial Fire Support System (AAFSS) program to field the service's first dedicated attack helicopter.

Nº Q432484 ★★★

Rara · Saberes

Lockheed AH-56 Cheyenne

1967 attack helicopter series by Lockheed

Texto em inglês

The Lockheed AH-56 Cheyenne is an attack helicopter developed by Lockheed for the United States Army. It rose from the Army's Advanced Aerial Fire Support System (AAFSS) program to field the service's first dedicated attack helicopter.

Último preço

—

Preço mínimo

—

Mediana 7 d

—

Vendas 30 d

0

Faixa 30 d

—

Em circulação

0

Cotação

Ver tabela
Datamediana MínMáxvendas

Histórico de vendas

Última venda
—
Média 30 d
—
Mínima 30 d
—
Máxima 30 d
—
Vendas 7 d
0
Vendas 30 d
0

Ainda sem vendas.

Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.

№ Edições numeradas · 0 cunhadas Próximo n.º 1 · Pontos ×3
Na Wikipédia

Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.

The Lockheed AH-56 Cheyenne is an attack helicopter developed by Lockheed for the United States Army. It rose from the Army's Advanced Aerial Fire Support System (AAFSS) program to field the service's first dedicated attack helicopter. Lockheed designed the Cheyenne using a four-blade rigid-rotor system and configured the aircraft as a compound helicopter with low-mounted wings and a tail-mounted thrusting propeller driven by a General Electric T64 turboshaft engine. The Cheyenne was to have a high-speed dash capability to provide armed escort for the Army's transport helicopters, such as the Bell UH-1 Iroquois. In 1966, the Army awarded Lockheed a contract for ten AH-56 prototypes, but as a stopgap also ordered the less complex Bell AH-1G Cobra as an interim attack aircraft for combat in the Vietnam War. The AH-56's maiden flight took place on 21 September 1967. In January 1968, the Army awarded Lockheed a production contract, based on flight testing progress. A fatal crash and technical problems affecting performance put the helicopter's development behind schedule, resulting in the cancellation of the production contract on 19 May 1969. Development of the Cheyenne continued in the hope that the helicopter would eventually enter service. As American involvement in the Vietnam War was winding down, the Army canceled the Cheyenne program on 9 August 1972. By this time, the AH-1 Cobra was widely deployed by the Army in South Vietnam and equipped with the TOW anti-tank missile. Controversy with the United States Air Force over the Cheyenne's role in combat as well as the political climate regarding military acquisition programs had caused the Army to amend the service's attack helicopter requirements in favor of a twin-engine conventional helicopter, viewed as less technical and more survivable. The Army announced a new program for an Advanced Attack Helicopter (AAH) on 17 August 1972,...

Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Wikimedia Commons (Public domain) ·

Cartas próximas

Ver a ficha

Confirmação