N

NeuConnect

Under construction submarine power cable in Europe

NeuConnect is a high-voltage direct current submarine power cable under construction since 2023 between the Isle of Grain, England and Wilhelmshaven Germany, expected to operate in 2028. It will be the first interconnector between the UK and Germany.

Nº Q85788332 ★

Comum · História

NeuConnect

Under construction submarine power cable in Europe

Texto em inglês

NeuConnect is a high-voltage direct current submarine power cable under construction since 2023 between the Isle of Grain, England and Wilhelmshaven Germany, expected to operate in 2028. It will be the first interconnector between the UK and Germany.

Último preço

—

Preço mínimo

—

Mediana 7 d

—

Vendas 30 d

0

Faixa 30 d

—

Em circulação

0

Cotação

Ver tabela
Datamediana MínMáxvendas

Histórico de vendas

Última venda
—
Média 30 d
—
Mínima 30 d
—
Máxima 30 d
—
Vendas 7 d
0
Vendas 30 d
0

Ainda sem vendas.

Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.

Na Wikipédia

Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.

NeuConnect is a high-voltage direct current submarine power cable under construction since 2023 between the Isle of Grain, England and Wilhelmshaven Germany, expected to operate in 2028. It will be the first interconnector between the UK and Germany. The cost of £2.4 billion (€2.8 billion) is financed by Meridiam from France, Allianz Capital Partners from Germany, Kansai Electric Power Company from Japan, and Tokyo Electric Power Company from Japan. The Chair of NeuConnect is Julia Prescot CBE.

Texto: Wikipédia em inglês, CC BY-SA 4.0. ·

Cartas próximas

Ver a ficha

Confirmação