Nottingham Express Transit
Light-rail tramway in England
Nottingham Express Transit (NET) is a 20-mile (32 km) tram system in Nottingham, England. The concept of a modern tramway to reduce road congestion and promote urban renewal was formally identified during the late 1980s while detailed planning was undertaken during the early 1990s.
Nº Q64138 ★
Comum · Lugares
Nottingham Express Transit
Light-rail tramway in England
Nottingham Express Transit (NET) is a 20-mile (32 km) tram system in Nottingham, England. The concept of a modern tramway to reduce road congestion and promote urban renewal was formally identified during the late 1980s while detailed planning was undertaken during the early 1990s.
Último preço
—
Preço mínimo
—
Mediana 7 d
—
Vendas 30 d
0
Faixa 30 d
—
Em circulação
0
Cotação
mediana
mín – máx
vendas
Sem vendas no período
Ver tabela
| Data | mediana | Mín | Máx | vendas |
|---|
Histórico de vendas
- Última venda
- —
- Média 30 d
- —
- Mínima 30 d
- —
- Máxima 30 d
- —
- Vendas 7 d
- 0
- Vendas 30 d
- 0
Ainda sem vendas.
Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.
Na Wikipédia
Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.
Nottingham Express Transit (NET) is a 20-mile (32 km) tram system in Nottingham, England. The concept of a modern tramway to reduce road congestion and promote urban renewal was formally identified during the late 1980s while detailed planning was undertaken during the early 1990s. The Greater Nottingham Light Rapid Transit Act 1994 authorising the project, then referred to as the Greater Nottingham Light Rapid Transport (GNLRT), received royal assent on 21 July 1994 and central government financing was provided in subsequent years. In March 2000, a 30-year Private Finance Initiative (PFI) concession was awarded to the Arrow Light Rail Ltd consortium, which became responsible for the design, funding, building, operation and maintenance of the line. On 9 March 2004, the system opened to the public; it was originally 8.7 miles (14 km) long and served 23 tram stops, having been constructed at a cost of £200 million, a sum equivalent to £361 million at 2025 price. The tramway's early ridership exceeded expectations, with 8.4 million journeys in 2004-5 and 9.7 million in 2005–6, against targets of 8 million and 9 million respectively; its performance led to the scheme's second phase, under which the tramway would more than double in size, promptly receiving approval on 25 October 2006. Financial backing for the second phase was not fully secured until 2011, while the original concession to operate the tramway was terminated on 16 December 2011. A new consortium, known as Tramlink Nottingham Limited, was finalised in December 2011. Construction of the second phase commenced in 2012, work was protracted and the extension was finally opened on 25 August 2015, roughly two years earlier than had been originally planned. Line 1 runs between Toton Lane and Hucknall, features a total of 33 or 34 tram stops, depending on direction, and has a journey...
Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Wikimedia Commons (CC BY-SA 3.0) ·
Cartas próximas
Manchester Metrolink
Light rail and tram system in Greater Manchester, England
Nº Q18548 ★★
Trams in Essen
Tramway network in Germany
Nº Q3537056 ★★★
Tramlink
Nº Q786032 ★★
Light Rail (MTR)
Light rail transit system in Hong Kong
Nº Q3083033 ★
RandstadRail
Light rail network in South Holland
Nº Q571257 ★
Rotterdamse Elektrische Tram
Transport company
Nº Q839557 ★