Tocoma Dam
Hydroelectric dam on the Caroní River, Venezuela
The Manuel Piar Hydroelectric Power Plant (Tocoma Dam) is a stalled hydroelectric development project in the Lower Caroní River Basin of Venezuela. The project, started in 2006, includes the installation of 2,320 megawatts (3,110,000 hp) MW to generate annual average energy of 12,100 gigawatt-hours (44,000 TJ).
Nº Q1356919 ★★★
Rara · Arquitetura
Tocoma Dam
Hydroelectric dam on the Caroní River, Venezuela
The Manuel Piar Hydroelectric Power Plant (Tocoma Dam) is a stalled hydroelectric development project in the Lower Caroní River Basin of Venezuela. The project, started in 2006, includes the installation of 2,320 megawatts (3,110,000 hp) MW to generate annual average energy of 12,100 gigawatt-hours (44,000 TJ).
No mapa
Último preço
—
Preço mínimo
—
Mediana 7 d
—
Vendas 30 d
0
Faixa 30 d
—
Em circulação
0
Cotação
mediana
mín – máx
vendas
Sem vendas no período
Ver tabela
| Data | mediana | Mín | Máx | vendas |
|---|
Histórico de vendas
- Última venda
- —
- Média 30 d
- —
- Mínima 30 d
- —
- Máxima 30 d
- —
- Vendas 7 d
- 0
- Vendas 30 d
- 0
Ainda sem vendas.
Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.
Na Wikipédia
Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.
The Manuel Piar Hydroelectric Power Plant (Tocoma Dam) is a stalled hydroelectric development project in the Lower Caroní River Basin of Venezuela. The project, started in 2006, includes the installation of 2,320 megawatts (3,110,000 hp) MW to generate annual average energy of 12,100 gigawatt-hours (44,000 TJ). As of 2019, the project is unfinished. The project was awarded to OIV consortium, consisting of Odebrecht (50%), Salini Impregilo (40%) and Vinccler (10%), with an initial budget US$3,061 mil. Ten Kaplan generator units, of 230 megawatts (310,000 hp), manufactured by an Argentinian company IMPSA, were predicted to begin operations between 2012 and 2014. These units had the world record as of 2012 in power generation at nominal head for Kaplan turbines. The diameter of the runner is 8.6 metres (28 ft) and nominal head is 34.65 metres (113.7 ft) with claimed output up to 232 megawatts (311,000 hp). The first generator was installed but not yet commissioned in April 2012. Behind schedule, the dam began to impound its reservoir on 16 November 2015. The budget tripled to $9,4 billion in 2017, as of 2019 the project is still unfinished. Odebrecht spent between 2007 and 2015 at least $118 million on bribes related to the project.
Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Antolin Martinez A. (CC BY-SA 3.0) ·
Cartas próximas
Ituango Dam
Dam in Ituango
Nº Q1675339 ★★★★
Usina Hidrelétrica de Itaipu
Usina hidrelétrica binacional localizada na fronteira entre Brasil e Paraguai
Nº Q244169 ★★★★★
Toktogul Dam
Dam
Nº Q278196 ★★★
Usina Hidrelétrica de Belo Monte
Usina hidrelétrica brasileira
Nº Q816119 ★★★★
Barragem do Vajont
Nº Q22335 ★★★★★
Hidrelétrica de Guri
Nº Q143529 ★★★