Comum · Arquitetura
Weissenstein Tunnel
Rail tunnel in Switzerland
The Weissenstein Tunnel is a 3,701 metres (12,142 ft) long, single-track railway tunnel on the Solothurn–Moutier railway line, built by the former Solothurn-Münster-Bahn. It passes under the 1,395-meter-high Weissenstein as a Jura crossing. Renovation of the tunnel took place from March 2024 to May 2026.
No mapa
Na Wikipédia
Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.
The Weissenstein Tunnel is a 3,701 metres (12,142 ft) long, single-track railway tunnel on the Solothurn–Moutier railway line, built by the former Solothurn-Münster-Bahn. It passes under the 1,395-meter-high Weissenstein as a Jura crossing. Renovation of the tunnel took place from March 2024 to May 2026.
Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Paebi (CC BY-SA 4.0) ·