Bakerloo line extension

Proposed southern extension of the London Underground

The Bakerloo line extension is a proposed extension of the London Underground's Bakerloo line in south-east London from Elephant & Castle to Lewisham. An extension southwards from Elephant & Castle was considered as early as 1913, with a formal proposal to extend to Camberwell in the late 1940s.

Nº Q4849252 ★

Común · Lugares

Bakerloo line extension

Proposed southern extension of the London Underground

Texto en inglés

The Bakerloo line extension is a proposed extension of the London Underground's Bakerloo line in south-east London from Elephant & Castle to Lewisham. An extension southwards from Elephant & Castle was considered as early as 1913, with a formal proposal to extend to Camberwell in the late 1940s.

En el mapa

Ver en OpenStreetMap · © los colaboradores de OpenStreetMap

Último precio

—

Precio mínimo

—

Mediana 7 d

—

Ventas 30 d

0

Rango 30 d

—

En circulación

0

Cotización

Ver tabla
Fechamediana MínMáxventas

Historial de ventas

Última venta
—
Media 30 d
—
Mínimo 30 d
—
Máximo 30 d
—
Ventas 7 d
0
Ventas 30 d
0

Aún no hay ventas.

Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.

En Wikipedia

Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.

The Bakerloo line extension is a proposed extension of the London Underground's Bakerloo line in south-east London from Elephant & Castle to Lewisham. An extension southwards from Elephant & Castle was considered as early as 1913, with a formal proposal to extend to Camberwell in the late 1940s. Since the late 2000s, Transport for London (TfL) has been planning an extension of the line, with a route to Lewisham via Old Kent Road safeguarded in 2021. TfL has also proposed taking over services on the Hayes line to Hayes and Beckenham Junction, which could occur following the completion of the extension to Lewisham. The extension would serve areas of south-east London with low levels of public transport availability, improving accessibility and reducing journey times. The extension would also support regeneration and housing development in the area. Estimated to cost between £4.7 and £7.9 billion (in 2017 prices), the extension would take around seven years to construct. Due to financial impacts of the COVID-19 pandemic, work to implement the extension is currently on hold.

Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: Sunil060902 (CC BY-SA 3.0) ·

Cartas cercanas

Ver la ficha

Confirmación