Bakerloo line extension
Proposed southern extension of the London Underground
The Bakerloo line extension is a proposed extension of the London Underground's Bakerloo line in south-east London from Elephant & Castle to Lewisham. An extension southwards from Elephant & Castle was considered as early as 1913, with a formal proposal to extend to Camberwell in the late 1940s.
Nº Q4849252 ★
Comum · Lugares
Bakerloo line extension
Proposed southern extension of the London Underground
The Bakerloo line extension is a proposed extension of the London Underground's Bakerloo line in south-east London from Elephant & Castle to Lewisham. An extension southwards from Elephant & Castle was considered as early as 1913, with a formal proposal to extend to Camberwell in the late 1940s.
No mapa
Último preço
—
Preço mínimo
—
Mediana 7 d
—
Vendas 30 d
0
Faixa 30 d
—
Em circulação
0
Cotação
mediana
mín – máx
vendas
Sem vendas no período
Ver tabela
| Data | mediana | Mín | Máx | vendas |
|---|
Histórico de vendas
- Última venda
- —
- Média 30 d
- —
- Mínima 30 d
- —
- Máxima 30 d
- —
- Vendas 7 d
- 0
- Vendas 30 d
- 0
Ainda sem vendas.
Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.
Na Wikipédia
Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.
The Bakerloo line extension is a proposed extension of the London Underground's Bakerloo line in south-east London from Elephant & Castle to Lewisham. An extension southwards from Elephant & Castle was considered as early as 1913, with a formal proposal to extend to Camberwell in the late 1940s. Since the late 2000s, Transport for London (TfL) has been planning an extension of the line, with a route to Lewisham via Old Kent Road safeguarded in 2021. TfL has also proposed taking over services on the Hayes line to Hayes and Beckenham Junction, which could occur following the completion of the extension to Lewisham. The extension would serve areas of south-east London with low levels of public transport availability, improving accessibility and reducing journey times. The extension would also support regeneration and housing development in the area. Estimated to cost between £4.7 and £7.9 billion (in 2017 prices), the extension would take around seven years to construct. Due to financial impacts of the COVID-19 pandemic, work to implement the extension is currently on hold.
Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: Sunil060902 (CC BY-SA 3.0) ·
Cartas próximas
Bakerloo line
Nº Q19892 ★★★
Jubilee line
Nº Q961290 ★★★
Material circulante no Metropolitano de Londres 1972
Nº Q1817694 ★★
Waterloo & City line
Nº Q207699 ★★
Material circulante no Metropolitano de Londres 1973
Nº Q1814255 ★★
London Underground 1938 Stock
Type of rolling stock formerly used on the London Underground
Nº Q2026312 ★