Waldenburg railway

Railway line in Switzerland

The Waldenburg railway (German: Waldenburgerbahn; WB) is a narrow-gauge light rail system in the canton of Basel-Landschaft, Switzerland. The 13.1-kilometre (8.1 mi) long single-track line runs from Liestal, the capital of the canton, to Waldenburg, with stops in Bubendorf, Hölstein, Niederdorf, and Oberdorf.

Nº Q154730 ★★★

Rara · Lugares

Waldenburg railway

Railway line in Switzerland

Texto en inglés

The Waldenburg railway (German: Waldenburgerbahn; WB) is a narrow-gauge light rail system in the canton of Basel-Landschaft, Switzerland. The 13.1-kilometre (8.1 mi) long single-track line runs from Liestal, the capital of the canton, to Waldenburg, with stops in Bubendorf, Hölstein, Niederdorf, and Oberdorf.

En el mapa

Ver en OpenStreetMap · © los colaboradores de OpenStreetMap

Último precio

—

Precio mínimo

—

Mediana 7 d

—

Ventas 30 d

0

Rango 30 d

—

En circulación

0

Cotización

Ver tabla
Fechamediana MínMáxventas

Historial de ventas

Última venta
—
Media 30 d
—
Mínimo 30 d
—
Máximo 30 d
—
Ventas 7 d
0
Ventas 30 d
0

Aún no hay ventas.

Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.

№ Ediciones numeradas · 0 acuñadas Próximo n.º 1 · Puntos ×3
En Wikipedia

Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.

The Waldenburg railway (German: Waldenburgerbahn; WB) is a narrow-gauge light rail system in the canton of Basel-Landschaft, Switzerland. The 13.1-kilometre (8.1 mi) long single-track line runs from Liestal, the capital of the canton, to Waldenburg, with stops in Bubendorf, Hölstein, Niederdorf, and Oberdorf. It connects to SBB train services in Liestal railway station. The line was temporarily closed between April 2021 and December 2022 for modernisation and conversion to metre gauge. Since 2016, the line has been operated by Baselland Transport (BLT), and was, with the exception of a few industrial and funicular lines, the only line in Switzerland with a track gauge of 750 mm (2 ft 5+1⁄2 in). It was opened on 1 November 1880 and was operated by steam-hauled trains until 1953, when electric operation began. New rolling stock was introduced from 1985. On 5 April 2021, the line closed for rebuilding to 1,000 mm (3 ft 3+3⁄8 in), and reopened on 11 December 2022. The 750 mm gauge rolling stock was sold for further service on the Čierny Hron Railway in Slovakia. Since 2022 the line has used ten metre-gauge seven-car Tramlink vehicles built by Stadler Rail. They are painted in the standard yellow Baselland Transport (BLT) livery. Beginning in 2025 the line will undergo automation, becoming fully driverless by 2030.

Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: MBxd1 (CC BY-SA 4.0) ·

Cartas cercanas

Ver la ficha

Confirmación