Waldenburg railway
Railway line in Switzerland
The Waldenburg railway (German: Waldenburgerbahn; WB) is a narrow-gauge light rail system in the canton of Basel-Landschaft, Switzerland. The 13.1-kilometre (8.1 mi) long single-track line runs from Liestal, the capital of the canton, to Waldenburg, with stops in Bubendorf, Hölstein, Niederdorf, and Oberdorf.
Nº Q154730 ★★★
Rara · Lugares
Waldenburg railway
Railway line in Switzerland
The Waldenburg railway (German: Waldenburgerbahn; WB) is a narrow-gauge light rail system in the canton of Basel-Landschaft, Switzerland. The 13.1-kilometre (8.1 mi) long single-track line runs from Liestal, the capital of the canton, to Waldenburg, with stops in Bubendorf, Hölstein, Niederdorf, and Oberdorf.
Último preço
—
Preço mínimo
—
Mediana 7 d
—
Vendas 30 d
0
Faixa 30 d
—
Em circulação
0
Cotação
mediana
mín – máx
vendas
Sem vendas no período
Ver tabela
| Data | mediana | Mín | Máx | vendas |
|---|
Histórico de vendas
- Última venda
- —
- Média 30 d
- —
- Mínima 30 d
- —
- Máxima 30 d
- —
- Vendas 7 d
- 0
- Vendas 30 d
- 0
Ainda sem vendas.
Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.
Na Wikipédia
Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.
The Waldenburg railway (German: Waldenburgerbahn; WB) is a narrow-gauge light rail system in the canton of Basel-Landschaft, Switzerland. The 13.1-kilometre (8.1 mi) long single-track line runs from Liestal, the capital of the canton, to Waldenburg, with stops in Bubendorf, Hölstein, Niederdorf, and Oberdorf. It connects to SBB train services in Liestal railway station. The line was temporarily closed between April 2021 and December 2022 for modernisation and conversion to metre gauge. Since 2016, the line has been operated by Baselland Transport (BLT), and was, with the exception of a few industrial and funicular lines, the only line in Switzerland with a track gauge of 750 mm (2 ft 5+1⁄2 in). It was opened on 1 November 1880 and was operated by steam-hauled trains until 1953, when electric operation began. New rolling stock was introduced from 1985. On 5 April 2021, the line closed for rebuilding to 1,000 mm (3 ft 3+3⁄8 in), and reopened on 11 December 2022. The 750 mm gauge rolling stock was sold for further service on the Čierny Hron Railway in Slovakia. Since 2022 the line has used ten metre-gauge seven-car Tramlink vehicles built by Stadler Rail. They are painted in the standard yellow Baselland Transport (BLT) livery. Beginning in 2025 the line will undergo automation, becoming fully driverless by 2030.
Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: MBxd1 (CC BY-SA 4.0) ·