Pandalungan

Passenger train service between Jakarta and Jember, Indonesia

Nº Q119141761 ★★★★★

Ultra rare · Savoirs

Pandalungan

Passenger train service between Jakarta and Jember, Indonesia

Texte en anglais

Pandalungan train is an executive & priority class that operated by Kereta Api Indonesia in Java which between Gambir and Jember via Semarang Tawang and Surabaya Pasarturi. The train offer 2x daily each way with morning and evening/night schedule around 919 km (571 mil) approximately 12 hours 47 minutes for this trip from Jakarta to Jember via Semarang and Surabaya.

Dernier prix

—

Prix plancher

—

Médiane 7 j

—

Ventes 30 j

0

Fourchette 30 j

—

En circulation

0

Cours

Voir le tableau
Datemédiane MinMaxventes

Historique des ventes

Dernière vente
—
Moyenne 30 j
—
Plus bas 30 j
—
Plus haut 30 j
—
Ventes 7 j
0
Ventes 30 j
0

Aucune vente pour l'instant.

Ventes anonymes : ni acheteur ni vendeur. Les chiffres ne comptent que les ventes entre joueurs.

№ Éditions numérotées · 0 frappées Prochain n° 1 · Score ×3
Sur Wikipédia

Texte en anglais Pas encore d'article dans ta langue : extrait en anglais.

Pandalungan train is an executive & priority class that operated by Kereta Api Indonesia in Java which between Gambir and Jember via Semarang Tawang and Surabaya Pasarturi. The train offer 2x daily each way with morning and evening/night schedule around 919 km (571 mil) approximately 12 hours 47 minutes for this trip from Jakarta to Jember via Semarang and Surabaya. The train was once the longest intercity train in Indonesia. However, the Pandalungan train's position as the 3rd longest passenger train route in Indonesia after the Blambangan Express as the longest intercity train in Indonesia, which was extended to Jakarta in July 2024, with a distance of 1,031 km (640 mil) connecting the eastern tip (Banyuwangi) and the capital of Indonesia, Jakarta and the Sangkuriang as the 2nd longest intercity train in the country, which from Bandung to Ketapang since May 2026 with a distance of 1,002 km (662 mil) connecting the eastern tip Banyuwangi and the capital of West Java, Bandung. The previous record was held by the Krakatau train (Krakatoa train), Merak-Blitar round trip, with 965 km (599 mil) via the southern route of Java, making it the only train to ever traverse all provinces on the island of Java.

Texte : Wikipédia en anglais, CC BY-SA 4.0. · Image : Wong Langsep (CC BY-SA 4.0) ·

Cartes voisines

Confirmation