Chengzhui line

Taiwan rail line

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station.

Nº Q5091398 ★★★

Rare · Places

Chengzhui line

Taiwan rail line

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station.

Last price

—

Floor price

—

7-day median

—

30-day sales

0

30-day range

—

In circulation

0

Price history

Show table
Datemedian LowHighsales

Sales history

Last sale
—
30-day average
—
30-day low
—
30-day high
—
Sales 7d
0
Sales 30d
0

No sales yet.

Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.

№ Numbered editions · 0 minted Next #1 · Score ×3
From Wikipedia

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station. As part of the "Greater Taichung Yamanote Line" plan by the Ministry of Transportation and Communications, the line was upgraded to double-track to allow for increased traffic between downtown Taichung and its coastal suburbs. Construction lasted from March 2019 to January 2020.

Text: Wikipédia, CC BY-SA 4.0. · Image: SSR2000 (CC BY-SA 3.0) ·

Related cards

View card

Confirmation