Chengzhui line

Taiwan rail line

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station.

Nº Q5091398 ★★★

Rare · Lieux

Chengzhui line

Taiwan rail line

Texte en anglais

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station.

Dernier prix

—

Prix plancher

—

Médiane 7 j

—

Ventes 30 j

0

Fourchette 30 j

—

En circulation

0

Cours

Voir le tableau
Datemédiane MinMaxventes

Historique des ventes

Dernière vente
—
Moyenne 30 j
—
Plus bas 30 j
—
Plus haut 30 j
—
Ventes 7 j
0
Ventes 30 j
0

Aucune vente pour l'instant.

Ventes anonymes : ni acheteur ni vendeur. Les chiffres ne comptent que les ventes entre joueurs.

№ Éditions numérotées · 0 frappées Prochain n° 1 · Score ×3
Sur Wikipédia

Texte en anglais Pas encore d'article dans ta langue : extrait en anglais.

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station. As part of the "Greater Taichung Yamanote Line" plan by the Ministry of Transportation and Communications, the line was upgraded to double-track to allow for increased traffic between downtown Taichung and its coastal suburbs. Construction lasted from March 2019 to January 2020.

Texte : Wikipédia en anglais, CC BY-SA 4.0. · Image : SSR2000 (CC BY-SA 3.0) ·

Cartes voisines

Voir la fiche

Confirmation