Chengzhui line

Taiwan rail line

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station.

Nº Q5091398 ★★★

Rara · Lugares

Chengzhui line

Taiwan rail line

Texto em inglês

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station.

Último preço

—

Preço mínimo

—

Mediana 7 d

—

Vendas 30 d

0

Faixa 30 d

—

Em circulação

0

Cotação

Ver tabela
Datamediana MínMáxvendas

Histórico de vendas

Última venda
—
Média 30 d
—
Mínima 30 d
—
Máxima 30 d
—
Vendas 7 d
0
Vendas 30 d
0

Ainda sem vendas.

Vendas anônimas: sem comprador nem vendedor. Os números contam só vendas entre jogadores.

№ Edições numeradas · 0 cunhadas Próximo n.º 1 · Pontos ×3
Na Wikipédia

Texto em inglês Ainda não há artigo no seu idioma: trecho em inglês.

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station. As part of the "Greater Taichung Yamanote Line" plan by the Ministry of Transportation and Communications, the line was upgraded to double-track to allow for increased traffic between downtown Taichung and its coastal suburbs. Construction lasted from March 2019 to January 2020.

Texto: Wikipédia em inglês, CC BY-SA 4.0. · Imagem: SSR2000 (CC BY-SA 3.0) ·

Cartas próximas

Ver a ficha

Confirmação