Chengzhui line

Taiwan rail line

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station.

Nº Q5091398 ★★★

Rara · Lugares

Chengzhui line

Taiwan rail line

Texto en inglés

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station.

Último precio

—

Precio mínimo

—

Mediana 7 d

—

Ventas 30 d

0

Rango 30 d

—

En circulación

0

Cotización

Ver tabla
Fechamediana MínMáxventas

Historial de ventas

Última venta
—
Media 30 d
—
Mínimo 30 d
—
Máximo 30 d
—
Ventas 7 d
0
Ventas 30 d
0

Aún no hay ventas.

Ventas anónimas: sin comprador ni vendedor. Las cifras solo cuentan ventas entre jugadores.

№ Ediciones numeradas · 0 acuñadas Próximo n.º 1 · Puntos ×3
En Wikipedia

Texto en inglés Aún no hay artículo en tu idioma: extracto en inglés.

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railway connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. Currently, only local services run through the Chengzhui Line, make a direct connect between stations on Mountain line and stations on Coastal line and 11.8 km shorter of travel route and without needed to transfer at Changhua station, saving about 10 minutes travel time and waiting time while transfer at Changhua station. As part of the "Greater Taichung Yamanote Line" plan by the Ministry of Transportation and Communications, the line was upgraded to double-track to allow for increased traffic between downtown Taichung and its coastal suburbs. Construction lasted from March 2019 to January 2020.

Texto: Wikipedia en inglés, CC BY-SA 4.0. · Imagen: SSR2000 (CC BY-SA 3.0) ·

Cartas cercanas

Ver la ficha

Confirmación